ML19247B833

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-423/79-04 on 790424-26.No Noncompliance Noted
ML19247B833
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/21/1979
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML19247B834 List:
References
NUDOCS 7908130609
Download: ML19247B833 (2)


See also: IR 05000423/1979004

Text

W6

4

1,*

UNITED STATES

p MoogDo,

NUCLEAR REGULATORY COMMisslON

$

),

j

REGION I

3

..g

631 PARK AVENUE

    • N

f

KING OF PRUSSI A. PENNSYLVANI A 19406

s ..v y

...

Docket No. 50-423

Northeast Nuclear Energy Company

ATTN:

Mr. W. G. Couns11

Vice President - Nuclear

Engineering Operations

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject:

Inspection 50-423/79-04

This refers to the inspection conducted by Mr. A. D. Toth of this office on

April 24-26, 1979 at the Millstone Nuclear Station Unit 3 at Waterford, Connecticut

and at the corporate office at Berlin, Connecticut of activitles authorized

by NRC License No. CPPR-ll3 and to the discussions of our findings held by

Messrs. H. Nims and S. Toth of your staff with Mr. Toth at the conclusion

of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within these areas, the inspection consisted of selective examinations of

procedures and representative records, interviews with personnel, and

observations by the inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractor)

believe to be proprietary, it is necessary that you make a written application

within 20 days to this office to withhold such information from public

disclosure. Any such application must be accompanied by an affidavit

executed by the owner of the information, which identifies the document or

part sought to be withheld, and which contains a statement of reasons which

addresses with specificity the items which will be considered by the Commission

as listed in subparagraph (b)(4) of Section 2.790.

The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document

Room.

bl.8Ci3

7908130

,

.

Northeast Nuclear Energy Company

2

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

@

Robert T. Carlson, Chief

Reactor Construction and Engineering

Support Branch

Enclosure:

Office nf Inspection and Enforcement Inspection

Report Number 50-423/79-04

cc w/ encl:

K. W. Gray, Construction Quality Assurance Lead

H. R. Nims, Director of Nuclear Projects

J. F. Opeka, Station Superintendent

J. R. Himmelwright, Licensing Safeguards Engineer

t;182730