ML19247B695

From kanterella
Jump to navigation Jump to search
Notifies That Review of Safeguards Contingency Plan Involves Consideration of Safeguards Issue,Requiring Payment of Class III Fee.Plans Should Be Submitted by 790823
ML19247B695
Person / Time
Site: Crane  Constellation icon.png
Issue date: 07/03/1979
From: Diggs R
NRC OFFICE OF ADMINISTRATION (ADM)
To: Herbein J
METROPOLITAN EDISON CO.
References
NUDOCS 7908130195
Download: ML19247B695 (2)


Text

i

,1 DT34 DOCKET NOS. 50-289 JUL 0 31979 j0-ppg Metropolitan Edison Coupany ATT:i: I:r. J. G. !!erbein

- Vice President - Generation P.O. Box 542 Reading, Pennsylvania 19C40 Gentlemen:

I i

This office has received a copy of your letter dated '1 arch 15,1979, ubich transmitted your Safequards Contingency Plan to the Office of Juclear Reactor l

Regulation for review and approval as recuired by 10 CFR 50.34(d) and 73.40(b) j of the Comission's regulations. The Plan is for the Three Mile Island @ clear j

Station (Units 1 and 2) under Facility Licenses GPR-50 and LPR-73.

The sub71ttal was not accompanied by an approval /anend, lent fee as required by Section 170.22 of 10 CFR Part 170.

Requests for approvals and/or license anendnents such cs identified above.should be classified in tha inanner set forth in Section 171.22.

Section 170.12(c) requires tnat your company provide a proposed deteruination of the amendaent (approval) class, state the basis therefor, and sub::iit the fee with your application for the approval or anendmant.

Based on a prelininary reviou of your Plan, we have deterained that it involves censideration of a safeguards issue requiring a Class III fee of 21,003 for one unit and a duplicate fee of %00 for the other unit.

You should pro ~ptly feruard i

to this office fees totalling 14,400. Fees are nayable to the U.S. luclear Regulatory Ccamission by check, draft or noney order.

If after the final evalu-ation of your plan is completed it is determined that it was incorrectly classi-fied, you will be refunded any overpayment or billed for any additional a: count due.

Your current Contingancy Plan, and the Guard Training Plans which are to to submitted by August 23, 1979 for revicu and approval are not considered aapli-j cations or filings requested by the ',c:nission for its convenienca for th:

l purpose of sin,,lifying or clarifying a license or its appended Technical Specifications.

Some of the it2ns new recuired to be subnitted for review j

and approval are as a result of regulaticas uhich were orcoult:ated prior to the i: arch 23, 1970 revision of Part 170 which added the new Section 170.22.

j Even though a regulation becane effective prior to " arch 23, 1970, this does t <.,nwe a :

'7008130195

-~.

JUI. 0 31379 Metropolitan Edison Cor.:pany.

not nean that submittals now received and requiring review and approval are except fron fees.

If we can be of assistance to you, call 3'11/492-7225.

Sincerely. -

orici al SIC" N #

11eba M. DICM Reba !i. Diggs Facilitias Program CoorJinator

. License Fee ::anaconnnt Branch Office of AJninistration DISTRIBUTI0ti:

FDR LPDR i

l Reg. Docket File (2)

!UGaitanis, RSLB HSilver, DPil ilService, DPfl-DDilanni, ORB-4 Ringram, ORB-4 DJDonoghue, ADil DRienstra, ADM Rf1Diggs, LFI1B LFMB neactor File (2)

LFt1B R/F (2)

Ptiorry, ADM a

e I

f I

b2ObS

.)

l I)/frJ

(*Ron gn_111 rnr enen enncorrn * )

i orric= >

..LE l3:.AD!L

..LE':D AD!L

. RSLBL

.0 ELD *.

' E. ' -.

i

$@.igy lc

,CJITojl oway,,

RC] a r k_.

RLFonner l

.u a. >

l

,g/tp/79 M'/ $79

. /., / 7 9..

,],,, f,7.9. -

7/

/79 N2C l'ORM 318 (9-76) NRO4 0243 W u.. eave==es sar reentine orrice s s e ts - se s - se e