ML19247B695
| ML19247B695 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 07/03/1979 |
| From: | Diggs R NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Herbein J METROPOLITAN EDISON CO. |
| References | |
| NUDOCS 7908130195 | |
| Download: ML19247B695 (2) | |
Text
i
,1 DT34 DOCKET NOS. 50-289 JUL 0 31979 j0-ppg Metropolitan Edison Coupany ATT:i: I:r. J. G. !!erbein
- Vice President - Generation P.O. Box 542 Reading, Pennsylvania 19C40 Gentlemen:
I i
This office has received a copy of your letter dated '1 arch 15,1979, ubich transmitted your Safequards Contingency Plan to the Office of Juclear Reactor l
Regulation for review and approval as recuired by 10 CFR 50.34(d) and 73.40(b) j of the Comission's regulations. The Plan is for the Three Mile Island @ clear j
Station (Units 1 and 2) under Facility Licenses GPR-50 and LPR-73.
The sub71ttal was not accompanied by an approval /anend, lent fee as required by Section 170.22 of 10 CFR Part 170.
Requests for approvals and/or license anendnents such cs identified above.should be classified in tha inanner set forth in Section 171.22.
Section 170.12(c) requires tnat your company provide a proposed deteruination of the amendaent (approval) class, state the basis therefor, and sub::iit the fee with your application for the approval or anendmant.
Based on a prelininary reviou of your Plan, we have deterained that it involves censideration of a safeguards issue requiring a Class III fee of 21,003 for one unit and a duplicate fee of %00 for the other unit.
You should pro ~ptly feruard i
to this office fees totalling 14,400. Fees are nayable to the U.S. luclear Regulatory Ccamission by check, draft or noney order.
If after the final evalu-ation of your plan is completed it is determined that it was incorrectly classi-fied, you will be refunded any overpayment or billed for any additional a: count due.
Your current Contingancy Plan, and the Guard Training Plans which are to to submitted by August 23, 1979 for revicu and approval are not considered aapli-j cations or filings requested by the ',c:nission for its convenienca for th:
l purpose of sin,,lifying or clarifying a license or its appended Technical Specifications.
Some of the it2ns new recuired to be subnitted for review j
and approval are as a result of regulaticas uhich were orcoult:ated prior to the i: arch 23, 1970 revision of Part 170 which added the new Section 170.22.
j Even though a regulation becane effective prior to " arch 23, 1970, this does t <.,nwe a :
'7008130195
-~.
JUI. 0 31379 Metropolitan Edison Cor.:pany.
not nean that submittals now received and requiring review and approval are except fron fees.
If we can be of assistance to you, call 3'11/492-7225.
Sincerely. -
orici al SIC" N #
11eba M. DICM Reba !i. Diggs Facilitias Program CoorJinator
. License Fee ::anaconnnt Branch Office of AJninistration DISTRIBUTI0ti:
FDR LPDR i
l Reg. Docket File (2)
!UGaitanis, RSLB HSilver, DPil ilService, DPfl-DDilanni, ORB-4 Ringram, ORB-4 DJDonoghue, ADil DRienstra, ADM Rf1Diggs, LFI1B LFMB neactor File (2)
LFt1B R/F (2)
Ptiorry, ADM a
e I
f I
b2ObS
.)
l I)/frJ
(*Ron gn_111 rnr enen enncorrn * )
i orric= >
..LE l3:.AD!L
..LE':D AD!L
. RSLBL
.0 ELD *.
' E. ' -.
i
$@.igy lc
,CJITojl oway,,
RC] a r k_.
RLFonner l
.u a. >
l
,g/tp/79 M'/ $79
. /., / 7 9..
,],,, f,7.9. -
7/
/79 N2C l'ORM 318 (9-76) NRO4 0243 W u.. eave==es sar reentine orrice s s e ts - se s - se e