Outlines Util Actions to Be Taken Re Failure of HPCI & Reactor Core Isolation Cooling Sys to Perform as Designed Following Reactor Trip on 790627
ML19247B601
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 06/28/1979
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
References
NUDOCS 7908100243
Download: ML19247B601 (2)


Text

-

~ l i< _m f G-i ea a'cw

)

[

'o, UNITED STATES NUCLE AR REGULATORY COMMISSION yy gj Q

REGIGN 11 lf#

5 4 ;Jh h

"[

c 101 M ARIE TT A ST., N VJ., SUIT E 3100

[

+

S'Pir AT L ANT A, G E ORGI A 30303

  • ...7 In Reply Refer To:

June 28, 1979 RII:JP0 50-321 50-366 Georgia Power Company Attn:

J. H. Miller, Jr.

Executive Vice President 270 Peachtree Street Atlanta, Georgia 30303 Gentlemen:

Subject:

Confirmation cf Action This refers to F. J. Long's telephone conversation of June 28, 1979, with W. E. Ehrensperger, Vice President, Engineering / Construction, regarding the failure of the High Pressure Coolant Injection (HPCI) and the Reactor Core Isolation Coolant (RCIC) systems to perform as designed following a reactor trip on June 27, 1979. With regard to matters discussed, it is our under-standing that both Hatch Plant units are shut down and that, prior to restart of either unit, the following actions will be completed to the satisfaction of the NRC:

1.

Investigate the HPCI and RCIC failures and take corrective actions as necessary.

As a minimum, your investigation will include:

a.

Determination of cause of the June 27, 1979, failure (s).

b.

A reevaluation of previous failures or abnomal perfonnances associated with the RCIC and HPCI systems.

c.

An evaluation of maintenance and repair activities and other plant practices which may affect the perfomance of these systems.

2.

Establish comprehensive retesting requirements which verify that the HPCI and RCIC systems perfom as designed.

3.

Discussion of the results of your investigation and retesting program with this office.

O s

F,8 6 7908100 2</3 o

f

.. June 28, 1979 Georgia Power Company Please inform this office immediately if your understanding of this matter is different from that stated above.

Sincerely,

^

w( G D

s J mes P. O'Reilly D1 ector

~

cc:

M. Manry, Plant Manager Post Office Box 442 s~

Baxley, Georgia 31513 C. E. Belflower Site QA Supervisor Post Office Box 442 Baxley, Georgia 31513 W. E. Ehrensperger Vice President, Engineering / Construction 270 Peachtree Street Atlanta, Georgia 30303 l\\

[ \\

'J C