ML19247B369

From kanterella
Jump to navigation Jump to search
Discusses Request to Delay Initiating Certain Portions of Matl Measurement Control Plan,Per 790313,0529 & 0601 Ltrs & 790531 Meeting.Grants Modified Delays & Outlines Revisions to License Condition
ML19247B369
Person / Time
Site: 07001113
Issue date: 06/22/1979
From: Partlow J
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Kaplan A
GENERAL ELECTRIC CO.
References
NUDOCS 7908080409
Download: ML19247B369 (2)


Text

'21

~

  • * %,,\\

UNITED STATES fj NUCLEAR REGULATORY COMMIS',10N p.

) 'l,,

C WASHINGTON, D. C. 20$55 t %.J @A / !

7 JUN 2 21979 SGML:RLJ 70-1113 General Electric Company ATTN:

Mr. A. L. Kaplan, Manager Licensing and Compliance Audits Mail Stop J-26 P. O. Box 780 Wilmington, North Carolina 28401 Gen tl emen :

This refers to your letters of May 29, and June 1,1979 and discus: ions between NRC and General Electric - Wilmingt:n personnel at NRC Headquarters May 31, 1979 concerning your request to delay initiating certain portions of your Material Measurement Control Plan (1J CFR 70.57) which became effective June 3, 1979.

This letter will also serve as a response to yo r letter of March 13, 1979 requesting modification of your current ticense Condition 21 to reflect that Appendix C is an enforceable section of your Fundamental Nuclear Material Contrcl Plan and that you are 'l compliance with current License Condition 2.2.

We nave Jetermined that the granting ci mcdified delays in implementing certain sections of your Material Measurement Control Plan will not endanger the common defense and Cecurity and is othermse in the public interest.

We have further determined that Appendix C is an integral cart of your FNMC Plan. Accordingly, License Condition 2.1 is revised and new License Condition 2.1.1 is added to Amendment MPP-2 to your License No. SNM-1097 to read as follows:

2.1 The licensee shall follow the Fundamental Nuclear Material Control Plan specified on pages xix through xxiv dated April 25, 1979 (except Appendix A and as stated in License Condit co 2.1.1) and shall follow i

page xxvi ( Appendix C) dated April 25, 1979, which contains descriptions of acceptable al ternative safeguard systems for meeting regulatory recuirements; with the exception of those pages listed as De-'onstration and as revised in accordance with the provisicns of 10 CFR 70.32(c).

2.1.1 Ine licensee snall hase implemented by June 3,1979 the Material Measurement Centrol Plan described in our letter to him dated May 4,1979 with the exception of those sections described in his letter and Attachments 1 and 2 dated May 29, 1979.

These sections snall be implemented no later than the scnedule specified in :ne licensee's letter and Attachments 1 and 2 dated May 29, 1979 nO7 79080_80403 50$

i.

~~-

It has been established that your letters of March 29, including Attachments 1 and 2 and May 13, 1979 with attachment and June 1,1979 with attachment, contains information of a type specified in 10 CFR 2.790(d).

Accordingly, pursuant to Section 2.790(d)(1), such information is deemed to be commercial or financial information within the meaning of 10 CFR 9.5(a)(?)

and shall be subject to disclosure only in accordance with the provisicns of 10 CFR 9.12.

Sincere p rdt.

Ja es G. Partlow, Chief Material Control & Accountability Licensing Branch Division of Safeguards a.

s

%