TERA
,f s,
- y..
?,
UNITED STATES
{ },,
c (,g NUCLEAR REGULATORY COMMISSION
- g\\'"'/,[E W ASHING TO N, D. C. 20555
?,.',,hh [,
6 v
JULY 2 0 579 D m et Nos. 50-321 and 50-366 Mr. Chwles F. Whitmer Vice President - Engineering Georgia Power Com?any P
- 9. Box 4545 Atlanta, Georgia 30302
Dear Mr. Whitmer:
^I.
EDW7N I. HATCH NUCLEAR POWER PLA!iTS, UtlITS 1 AND 2 We are reviewing your submittals dated April 25, and May 9,1979 in response to IE Bulletin 79-08. We have determined that the additional information requested in the enclosure is necessary in orde,- to complete our safety evaluation.
We request that respenses to the items in the enclosure be forwarded to this office within two weeks of your receipt of the enclosure, which was previously transmitted to you oy telecopy.
Please contact William F. Kane at (301) 492-7745 if you require edditional discussions or clarification regarding the infomation requestr.d.
SincereJy ci Thomas A. Ippoliti, Ch ef Operating Reactors Branch #3 Division of Operating Reactors
Enclosure:
Request for Addi cional Infomation cc w/ enclosure:
S c next page c;
l ) )
Jdl
'7008oso SI7
Mr. Charles F. Whitmer Georgia Power Company
- 2 JULY 20579 cc:
G. F. Trowbridge, Esquire Shaw, Dittman, Potts and Trowbridge 1800 M Street, N. W.
Washington, D. C.
20036 Ruble A. Thomas Vice President P. O. Box 2625 Southern Services, Inc.
Birmingham, Alabama 35202 Mr. Warry Majors Southern Services, Inc.
300 Office Park Birmingham, Alabama 35202 Mr. William Widner Georgia Power Company Power Generation Department P. O. Box 4545 Atlanta, Georgia 30202 Mr. L. T. Gucwa Georgia Power Company Engineering Department P. O. Box 4545 Atlanta, Georgia 30302 Appling County Public Library Parker Street Baxley, Georgia 31413 Mr..R. F. Rogers U. S. Nuclear Regulatory Commission P. O. Box 710 Bax'ey, Georgia 31513 0lY
Enclosure HATCH 1
2 REQUESTS FOR ADDITIONAL INFORMATION IES 79-08 Item No. 2 1.
Your response is incomplete in that it does not indicate the Tu have reviewed procedures to assure that containment isolatio,.
initiation is in conformance with ! tem No. 2 of IEB 79-08.
Verify that you have reviewed the required procedures or provide the schedule for completing that review.
2.
Your response indicates that the normal vent valves in Unit 2 are isolated on containment isolation signals.
Confirm that contain-ment isolation occurs on all lines not needed for safety features or cooling capability on all automatic initiations of safety injection.
3.
Your response is not clear regarding the Dtywell Vent and Purge System for each unit.
It appears that a procedure is required co have t i. e operator (who is stationed at the control panel) isolate this system upon automatic initiatior, of safety injection when this system is in use in Unit 1.
Provide the schedule for completion of any necessary procedural and/or design changes.
Item No. 4 1.
Describe other instrumentation which the operator might have to determine changes in reactor coolant inventory, e.g.,
drywell high
- pressure, radioactivity levels, suppression pool high temperature, containment su=p pump operation, etc.
Item No. 5 1.
Your response to item Sa and 5b does not addr:ss training instruc-titns.
Amend your response to address this matter.
2.
Provide a schedule for any actions on item 5 tbat have.i o t yet been completed.
Item No. 6 1.
Please augment your response to indicate the extent to which position and locking device checks are performed for locked safety system valves, kh9 b
Item No. 7 1.
Provide the basis for continued operability of the features used t'
prevent inadvertent transfer of radioactive gases and liquids out-side of containment.
2.
Verify that inadvertent transfer of radioactive gases from contain-ment will not occur on resetting engineered.nafety features instru-mentation.
Item No. 3 1.
It is not clear from your response that all involved reactor opera-tional personnel in the oncc ming shift are explicitly notified about the status of systems _emoved from ar returned to service.
Please indicate how this information is transferred at shift turnover.
Item No. 9 1.
Technical Specifications and other d o c ur: a n t s may not include all relevant notification cr;?eria required by item 9 of IES 79-08.
We note that, at this time, aucquate guidance cannot be given on what constitutes an event requiring one hour notification.
We will require a general statement corcerning reactor operation in an uncon-trolled or unexpected condition until sufficient experience is accumulated to warrant issuance of a specific set of notification criteria.
4,800
-f /7
//
JUL