ML19247A946

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-327/79-28 & 50-328/79-15 on 790508-11.No Noncompliance Noted
ML19247A946
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/31/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19247A947 List:
References
NUDOCS 7908030594
Download: ML19247A946 (2)


See also: IR 05000327/1979028

Text

m

,

ga "'%

+

o

UNITED STATES

E ' g* %',,g' 'g

NUCLEAR REGULATORY COMMISSION

.,

  1. 1 c

REGION ll

j'

.

o, p y!

[

101 M ARIETT A sT., N W., SUIT E 3100

\\ .V [

ATLANTA, GEORGI A 30303

  • ...

MAY 311979

In Reply Refer To:

RII:RJH

50-327/79-28

50-328/79-15

Tennessee Valley Authority

AITN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gent 1emen:

This refers to the inspection conducted by R. J. Hardwick of this office on

Mt.y 8-11, 1979, of activities authorized by hRC Construc+. ion Permit Nos.

CPPR-72 and CPPR-73 for the Sequoyah 1 and 2 facilities, and to the

discussion of our findings held with G. G. Stack at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within

20 day, to this office to withhold such information from public disclosure.

Any such application must include a full statement of the reasons on the

basis of which it is claimed that the information is proprietary, and should

be prepared so t'at proprietr.ry information identified in the application is

contained in a separate pet of the document.

If we do not hear from you in

this regard within the specified period, the report will be placed in the

Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

/

421

258

-

Y

O E~ f

zgoEo

C. E. Murphy, Chief

Reactor Construction and Engineering

Support Branch

.

MAY 31 1979

Tennessee Valley Authority

-2-

.

Enclosure:

Inspection Report Nos. 50 ;27/79-28

and 50-328/79-15

cc w/ encl:

J. E. Gilleland

Assistant Manager of Power

500C Chestnut Street Tower II

Chattanooga, TN 3740'

G. G. Stack, Project Manager

P. O. Box 2000

Daisy, TN 37319

J. M. Ballentine

Plant Superintendent

P. O. Box 2000

Daisy, TN 37319

J. F. Cox

400 Commerce Street

W10Cl31 C

Knoxville, TN 37902

D. L. Lambert, Project Engineer

400 Chestnut Street Tower II

Chattanooga, TN 37401

421

259