ML19247A841
| ML19247A841 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 05/29/1979 |
| From: | Schwencer A Office of Nuclear Reactor Regulation |
| To: | Reed C COMMONWEALTH EDISON CO. |
| References | |
| NUDOCS 7908020546 | |
| Download: ML19247A841 (3) | |
Text
.~..
O pa arc,.
e UNITED STATES y,
k NUCLEAR REGULATORY COMMISSION y
g WASHINGTON. O. C. 20555
': C S
8
~**...., **'
May 29, 1979 Docket Nos. 50-295 and 50-304 Mr. Cordell Reed Assistant Vice President Commonwealth Edison Compan)
Post Office Box 767 Chicago, Illinois 60690
Dear Mr. Reed:
Enclosed for your information are errata to the staffs Safety Evaluation 29, 1979, relating to your Environmental Impact Appraisal dated March request to increase the storage capacity of the spent fuel storage pool at the Zion Station.
Sincerely,
/,
ikw&dku A. Schwencer, Chief Operating Reactors Branch #1 Division of Operating Ree: tors
Enclosure:
As Stated 426 358
'70 0802 0 f'/f
Mr. Cordell Reed May 29, 1979 Commonweal th Edison Company cc:
Robert J. Vollen, Esquire 109 North Dearborn Street Chicago, Illinois 00602 Dr. Cecil Lue-H'ng Director of Research and Development Metropolitan Sanitary District of Greater Chicago 100 East Erie Street Chicago, Illinois 60611 Zion-Benton Public Library District 2600 Emmaus Avenue Zion, Illinois 50099 Mr. Phillip P. Steptoe Isham, Lincoln and Beale Counselors at Law One First National Plaza 42nd Floor Chicago, Illinois 60603 Susan H. Sekuler, Esquire Assistant Attorney General Environmental Control Division
- 88 West Randolph Street, Suite 2315 Chicago, Illinois 60601 Dr. Linda W. Li ttle Research Triangle Institute P. O. Box 12194 Research Triangle Park, N. C.
27709 Or. Fe. rest J. Remick 305 East Hamilton Avenue State College, Pennsylvania 16801 Rick Konter 617 Piper Lane Lake Villa, Illinois 60046 426 359
I ERRATA TO THE STAFF'S SAFETY EVALUATION (SE) l AND ENVIRONMENTAL IMPACT APPRAISAL (EIA)
DATED MARCH 29, 1979 REGARDING THE PROPOSED EXPANSION OF THE ZION STATION SPENT FUEL POOL CAPACITY i
E Page 2-2, under "Parareter Change," item number 1, change "3.1" to read 1.
"3.2".
Page 2-5, the last paragraph, last line, change to read "spe.
fuel handling 2.
tool over stored spent fuel."
3.
Page 2-6, second paragraph, ninth line, change "five times as great" to read "three' times as great."
l EIA 1.
Page 7-6, second paragraph, fif th line, af ter " level" add "at the start of the next operating cvcle for each unit,".
2.
Page 7-6, third paragraph, first line, change "322" to read "432."
i I
426 360
-