CENTRAL FILES
[#3 "%
c UNITED STATES M.Q
~$7 NUCLE AR REGULATORY COhlallSSION L R g. WJO.gy g N.
C REGION IV I
o, ' ikd[,[
G11 RYAN PLAZ A ORIVE, SutTE 10GJ N$IC 4
~,,,~
July 6, 1979 Dockat No.
50-235 Onaha Publia Po'aer District AITU:
T. E.
- Short, Assistant General Manager 1623 F2=ey Street Onaha, Nebraska 63102 Gentlemen:
This IE Info mation Notice is provided as an early notification of a possibly significant catter.
It is expected that recipients will review the infor=ation for possible applicability to their facilities.
No specific action or response is requested at this ti=e.
If you have questions regardin3..his tatter, please contact the Director of the appropriate NRC Regional Office.
& 4, Y' ^J Karl V. Seyfrie'
.~
Director
Enclosures:
1.
IE Info =ation Notice No. 79-13 2.
List of IE Information Notice Issued in 1979 cc:
R. L. Andreas, Manager Fort Calhoun Station Post Office Sox 93 Fo rt Calh oun, Nebraska 65102 Af S
'T U) c' u !. y
/
s 7 908010 O D3
UNITED STATES NUCLEAR REGUL\\ TORY COFDiISSION OFFICE OF INSPECTION AND ENFORCE}1ENT WASHINGTON, D.C.
20555 IE Information Notice No. 79-18 Date:
July 6, 1979 Page 1 of I SKYLG REENTRY Description of Circumstances:
The most recent dates for reentry of Skylab are July 10 to 14, 1979,.ith July 12, as the most probable date. Recogr.izing that a hit csn a nuclear reactor would be highly unlikely by Skylab debris, the NRC believes it would be prudent for licensees to review their contingency plans in case such an event should actually occur.
The NRC is in communication with the Department of Energy (DCE), and will receive notification f rom them as soon as '_ Te reentry corridor can be established.
This notification ma'y occur t.. thin 1 to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> before reentry actually occurs.
If it is determined that there are any licensed nuclear power plants _in the reentry corride r, the plants will receive notification frca their respective Regiona' Office via the dedicated phone line.
This Information Notice is provided as an early notification of a possibly significant matter.
It is expected that recipients will review the informa-tion for possible applicability to their facilities.
No specific action or response is requested at this time.
If further NRC evaluations so indicate, an IE Circular or Bulletin will be issued to recocaend or recuest specific licnesee acticas.
If you have quest:cas ragarding the aatter, please contact the Director of the appropriate NEC Regicnal Office.
No written respcase to this infornation not ce is required.
' 't - f em
[
b4
?0071gggg,
9 IE Information Notice No. 79-18 July 6, 1979 LISTING OF IE INFORMATION NOTICES ISSL'ED IN 1979 Info rma tion Subject Date Issued To Notice No.
Issued 79-01 Bergen-Paterson Hydraulic 2/2/79 All power reactor Shock and Sway Arrestor facilities with an Operating License (OL) or a Construc-tion Permit (CP) 79-02 Attempted Extortion -
2/2/79 All Fuel Facilities Low Enriched Uranium 79-03 Limitorque Valve Geared 2/9/79 All power reactor Limit Switch Lubricant facilities with an Operating License (OL) or a Construc-tion Permit (CP) 79-04 Degradation of Engineered 2/16/79 All power reactor Safety Features facilities with an Operating License (OL) or a Construc-tion Permit (CP) 79-05 Use of Improper Materials 3/21/79 All pcwer reactor In Safety-Related Components facilities with an Operating License (OL) or a Construc-tion Permit (CP) 79-C6 Stress Analysis of 3/23/79 All Holders of an Safety-Related Piping Reactor Operating License (OL) or a Constructica Permit (CP) 79-07 Rupture of Radwaste 3/26/79 All pcwer reactor Tanks facilities with an Operating License (OL) or a Construc-tica Permit (CP)
Enclosure Page 1 of 2
,/i f 7 c /..J 7
Jc
IE Information Notice No. 79-18 July 6, 1979 79-08 Interconnection of 3/28/79 All pcwer reactor Contaminated Systems with facilities with an Service Air Systems Used Operating License As the Source of Breathing (OL) and Pu Proces-Air sing fuel facilities 79-09 Spill of Radioactively 3/30/79 All power reactor Contaminated Resia facilities with an Operating License (OL) 79-10 Nonconforming Pipe 4/16/79 All power reactor Support Struts facilitir with a Construction Pe rmit (CP) 79-11 Lower Reactor Vessel Head 5/7/79 All Holders of Reactor Insulation Support Problem Operating Licenses (OLs)
Construction Permits (cps) 79-12 Attempted Damage to New 5/11/79 All fuel facilities, Fuel Assemblies research reactors, and power reactors with an Operating Licensee (OL) or a Construction Permit (CP) 79-13 Indicatica of 7.w Water 5/29/79 All Holders of Operating Level in the, ster Creek License (OL) or Reactor Construction Permit (CP) 79-14 NRC Position of Electrical 6/11/79 All Power Reactor Cable Support Systems facilities with a Construction Permit (CP) and applicants 79-15 Deficient Proced2res 6/7/79 All Holders of Reactor Operating Licenses (GLs) and Construction Pe rmits (cps) 79-16 Nuclear Incident at Three 6/22/79 All Research Reactors Mile Island and Test Reactors with Operating Licenses (OLs) 79-17 Source Holder Assembly 6/20/79 All Holders of Reactor Damage From Misfit Between Operating Licenses (OLs)
Assembly and Reactor Upper and Construction Grid Plate Pe rmits (cps)
Enclosure ann n
Page 2 of 2 4UE
- l. n D