[# "'%,[o, CENTRAL FILES UNITED STATE 9 M dQ y'gp.,.g((y NUCLEAR REGULATORY COMMISSION I

R

':;;g g.

REClON IV SEf

[

611 RYAN PLAZA ORIVE, SUITE 1000 MS[C

%/ g ARLINGTON, TE XA3 76012 July 6, 1979 Docket No.

50-298 Nebraska Public Power District ATTN:

J. M. Pilant, Director Licensing & Qttality Assurance Post Office Sox 499 Columbus, Nebraska 68601 Gentlenen:

This IE Infor=ation Notice is provided as an early notification of a possibly significant catter.

It is expected that recipients vill review the infor ation for possible applicability to their facilities.

No specific actica or response is requested at this time.

If you have questions regarding this tatter, please contact the Director of the appropriate NRC Regional Office.

9 1

' ic f.

p 1

~

Karl V. Seyfri Director

Enclosures:

1.

IE Information Notica No. 79-13 2.

List of IE Information Notice Issued in 1979 cc:

L.

C. Lessor, Superintendent Cooper Nuclear Station Post Office Sex 93 3rovnville, Nebraska 63321 To7 Moco 23 r:9u5 4 *;

me v

LWITED STATES NUCLEAR REGULATORY C0!NISSION OFFICE OF INSPECTION MD ENFORCEMENT WASHINGTON, D.C.

20555 IE Information Notice No. 79-18 Date: July 6, 1979 Page 1 of 1 SKYLiB REENTRY Description of Circumstances:

The most recent dates for reentry of S'cf ab are July 10 to 14, 1979, with l

July 12, as the cost probable date.

Recognizing that a hit on a nuclear reactor would be highly unlikely by Skylab debris, the NRC believes it would be prudent for licensees to review their contingencf plans in case such an event should actually occur.

The NRC is in communication with the Depart =ent of Energy (DOE), and will receive notification from thea as soon as the reentry corridor can be established. This notification cay occur within 1 to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> before reentry actually occurs.

If it is determined that there are any licensed nuclear power plants _ in the reentry corridor, the plants will receive notification from thdir respective Regional Office via the dedicated phone

~

line.

This Information Notice is provided as an early notification of a possibly significant matter.

It is expected that recipients will review the informa-tion for possible applicability to their facilities.

No specific action or response is requested at this time.

If further NRC evaluations so indicate, an IE Circular or Bulletin will be issued to recccmend or request specific licnesee actions.

If you have questions regarding the matter, please contact the Director of the appropriate NRC Regional Office.

No written response to this information notice is required.

585EFG dup.n 7907120387

IE Information Notice No. 79-18 July 6, 1979 LISTING OF IE INFORMATION NOTICES ISSUED IN 1979 Info rma tion Subject Date Issued To Notice No.

Issued 79-01 Bergen-Paterson Hydraulic 2/2/79 All power reactor Shock and Sway Arrestor facilities with an Operating License (0L) or a Construc-tion Permit (CP) 79-02 Attempted Extortion -

2/2/79 All Fuel Facilities Low Enriched Uranium 79-03 Limitorque Valve Geared 2/9/79 All power reactor Limit Switch Lubricant facilities with an Operating License (OL) or a Construc-tion Permit (CP) 79-04 Degradation of Engineered 2/16/79 All power reactor Safety Features facilities with an Operating License (OL) or a Construc-2, tion Permit (CP) 79-05 Use of Icproper Materials 3/21/79 All power reactor In Safety-Related Components facilities with an Operating License (OL) or a Construc-tion Permit (CP) 79-C6 Stress Analysis of 3/23/79 All Holders of au Safety-Related Piping Reactor Operating License (OL) or a Construction Pe nrit (CP) 79-07 Rupture of Radwaste 3/26/79 All power reactor Tanks facilities with an Operating License (OL) or a Construc-tion Permit (CP)

Enclosure Page 1 of 2

- <, e q

IE Information Notice No. 79-18 July 6, 1979 79-08 Interconnection of 3/23/79 All power reactor Contaminated Systems with facilities with an Service Air Systems Used Operating License As the Source of Breathing (OL) and Pu Proces-Air sing fuel facilities 79-09 Spill of Radioactively 3/30/79 All power reactar Contaminated Resin facilities with an Operating License (OL) 79-10 Nonconforming Pipe 4/16/79 All power reactor Support Struts facilities with a Construction Permit (CP) 79-11 Lower Reactor Vessel Head 5/7/79 All Holders of Reactor Insulation Support Problea Operating Licenses (0Ls)

Construction Permits (cps) 79-12 Attempted Damage to New 5/11/79 All fuel facilities, Fuel Assemblies research reactors, and power reactors with an Operating Licc-'ee (OL)

"" ~

or a Construction Permit (CP) 79-13 Indicatica of Low Water 5/29/79 All Holders of Operating level in the Oyster Creek License (OL) or Reactor Construction Permit (CP) 79-14 NRC Position of Electrical 6/11/79 All Power Reactor Cable Support Systems facilities with a Corstruction Permit (CP) and applicants 79-15 Deficient Procedures 6/7/79 All Holders of Reactor Operating Licenses (CLs) and Ccustruction Permits (cps) 79-16 Nuclear Incident at Three 6/22/79 All Research Reactors Mile Island and Test Reactors with Operating Licenses (OLs) 79-17 Source Holder Assembly 6/20/79 All Holders of Reactor Damage Frca Misfit Between Operating Licenses (OLs)

Assembly and Reactor Upper and Construction Grid Plate Permits (cps)

Ecclosure Page 2 of 2 M9$5$

va