ML19247A348

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-213/79-08 on 790320-23 & Notice of Violation
ML19247A348
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 05/09/1979
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML19247A346 List:
References
NUDOCS 7907310011
Download: ML19247A348 (2)


See also: IR 05000213/1979008

Text

.

.

j/

4

UNITED STATES

J'-

NUCLEAR REGULATORY COMMISSION

f

Ii*(

S

REGION i

7 'Y,

f

s31 PARK AVENUE

"

KING OF PRUSSI A. PENNSYLV ANI A 19406

.

.....

,

MM 9

W5

Docket No. 50-213

Connecticut Yankee Atomic Power Company

ATTN:

Mr. W. G. Counsil

Vice President - Nuclear

Engineering and Operatiens

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject:

Inspection 50-213/79-08

This refers to the inspection conducted by Mr. W. Baunack of this office

on March 20-23, 1979 at the Haddam Neck Plant, Haddam, Connecticut of

activities authorized by NRC License No. DPR-61 and to the discussions

of our findings held by Mr. Baunack with Mr. J. Ferguson at the conclusion

of the inspection, and to a subsequent telephone discussion catween Mr.

Baunack and Mr. Graves on March 28, 1979.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter.

Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Our inspector also verified the steps you have taken to correct the item

of noncompliance brought to your attention in a letter dated March 28,

1979.

We have no further questions regarding your action at this time.

Based on the results of this inspection, it appears that one of your

activities was not conducted in full compliance with NRC requirements,

as set forth in the Notice of Violation, enclosed herewith as Appendix

A.

This item of noncompliance has been categorized into the levels as

described in our correspondence to you dated December 31, 1974.

Thi

notice is sent to you pursuant to the provisions of Section 2.201 of the

NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office, within twenty (20)

days of your receipt of this notice, a written statement or explanation

in reply including:

(1) corrective steps which have been taken by you

and the results achieved; (2) corrective steps which will oe taken to

avoid further items of noncompliance; and (3) the date when full complitnce

will be achieved.

0

yi Z.

15g

7907310

.

.

Connecticut Yanker. Atomic

2

gg

,,,

""

Power Company

In accordance with Section 2.790 of the flRC's " Rules of Practica," Part

2, Title 10 Code of Federal Regulations, a copy of this letter and the

enclosures will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to

be proprietary, it is necessary that you make a written application

within 20 days to this office to withhold such information from public

disclosure.

Any such application must be accompanied by an affidavit

executed by the owner of the information, which identifies the document

or part sought to be withheld, and which contains a statement of reasons

which addresses with specificity the items which will be considered by

the Commission as listed in subparagraph (b)(4) of Section 2.790.

The

information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in

this regard within the specified period, the report will be placed in

the Public Document Room.

Should you have any questions concerning this inspection, we will be

pleased to discuss them with you.

Sincerely,

O

\\

m

-

Brunner, Chief

.

Reictor Operations and Nuclear

dupportBranch

Enclosures:

1.

Appendix A, flotice of Violation

2.

Office of Inspection and Enforcement Inspection

Report Number 50-213/79-08

cc w/encls:

R. Graves, Plant Superintendent

D. G. Diedrick, Manager of Quality Assurance

J. R. Hinnelwright, Licensing Safeguards Engineer

4 ct ?.

169