Text
,
p **8Co
UNITEo sT ATE S
,
NUCLEAR REGULATORY COMMISSION
f
,
,,
[ '
- t P( [
REGloN lit
o
.' f
799 ROOSEVELT mo Ao
e
p' 4
,
D
E
GLEN E LLYN. tLLINol5 60137
%, ...../
JUN 131373
Docket No. ;3-266
Docket No. 50-301
'
Wisconsin Electric Power
Company
ATTN:
Mr. Sol Eurrtein
Executive Vice President
Power Plants
231 West Michigan
Milwaukee, WI
53201
Gentlemen:
This refers to the inspection conducted by Messrs. W. L. Axelson and
J. W. Hiatt of this office on May 31, 1979, of activities at Point
Beach Nuclear Pc er Plant, Units 1 and 2, authorized by NRC Operating
Licenses No. DPR-24 and No. DPR-27 and to the discussion of our
findings with Mr. G. Peed and others of your staff at the conclusion
of the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted
cf a selective examination of procedures and representative records.
observations, and interviews with personnel.
No items of noncompliance tith NRC requirements were identified
during the course of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter
and the enclosed inspection report will be placed in the NRC's
Public Document Room, except as follows.
If this report contains
information that you or your contractors believe to be proprietary,
you must apply in writing to this office, within twenty days of your
receipt of this letter, to withhold such information from public
disclosure. The application must include a full statement of the
reasons for which the information is considered proprietary, and
should be prepared so that proprietary information identified in the
application is contained in an enclosure to the application.
47.6
'
7907300Mt
-
.
.
JUN 131979
Wisconsin Electric Power
-2-
Company
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
,
1
=
A. B. Davis, Chief
Fuel Facility and
Materials Safety Branch
Enclosure:
IE Inspection
Rpts. No. 50-256/79-07 and
No. 50-301/79-09
cc w/ encl:
Mr. G. A. Reed, Manager
Central Files
Reproduction Unit NRC 20b
Local PDR
NS:C
Sandra A. Bast, Lakeshore
Citizens for Safe Energy
426