Forwards IE Insp Repts 50-327/79-27 & 50-328/79-14 on 790507-11.No Noncompliance Noted
ML19246C567
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/30/1979
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Praris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19246C569 List:
References
NUDOCS 7907260532
Download: ML19246C567 (2)


See also: IR 05000327/1979027

Text

~k

}Q

,

.

[pn nuc

[o

UNITED STAl dS

g

e

3 .,s gf( o

NUCLEAR REGULATORY COMMISSION

.

$

"#.

I

REGION 11

c,,

f

101 MARIETT A sT., N.W., sUtTE 310o

ATLANT A, G EoRGI A 30303

\\ ..... &

MAY 3 01979

In Reply Refer To:

RII:WJM

50-327/79-27

50-328/79-14

Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

This refers to the inspection conducted by W. J. Millsap of this office on May 7-11,

1979, of activities authorized by NRC Construction Permit Nos. CPPR-72 and CPPR-73

for the Sequoyah Nuclear Plant, and to the discussion of our findings held with

W. F. Popp at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the enclosed

inspection report. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with personnel,

and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title 10,

Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be ,,roprietary, it is

necessary that you make a written epplication within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

Y

. T. Sutherland, Chief

Fuel Facility and Materials

Safety Branch

df}4

@

M

78072606 31

-

MAY 3 0197

L

Tennessee Valley Authority

-2-

'

Enclosure:

Inspection Report Nos.

50-327/79-27 and 50-328/79-14

cc w/ encl:

J. E. Gi11 eland

Assistant Manager of Power

500C Chestnut Street Tower II

Chattanooga, TN 37401

G. G. Stack, Project Manager

P. O. Box 2000

Daisy, TN 37219

J. M. Ballentine

Plant Superintendent

P. O. Box 2000

Daisy, TN 37319

J. F. Cox

400 Commerce Street

W10C131 C

Knoxville, TN 37902

D. L. Lambert, Project Engineer

400 Chestnut Street Tower II

Chattanooga, TN 37401

424

082