Forwards IE Insp Rept 50-301/79-06 on 790402-03.No Noncompliance Noted
ML19246C562
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/07/1979
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML19246C563 List:
References
NUDOCS 7907260524
Download: ML19246C562 (2)


See also: IR 05000301/1979006

Text

PDR

-

,

,

,

O

4

UNITED STATES

j

.

,fj

. ~'g

NUCLE AR REGULATORY COMMISSION

(i ;

j

REGloN ill

j . {i

f

799 AoCSE V E L? RoAo

%,

' e4

J'

GLEN E LLvN i L L ' N o t s 6 013 7

.

.....-

MAY 7

1979

Docket No. 50-301

Wisconsin Electric Power

Company

ATTN:

Mr. Sol Surstein

Executive Vice President

Power Plants

231 West Michigan

Milwaukee, WI

53201

Gentlemen:

This refers to the inspection conducted by Messrs. J. E. Menning

and E. R. Swanson of this office on April 2-3,

1979, of activi-

ties at Point Beach Nuclear Power Plant, Unit 2, authorized by

NRC Operating License No. DPR-24, and to the discussion of our

findings with Messrs. G. A. Reed and J. Greenwood at the

conclusien of the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection. Within these areas, the

inspection censisted of a selective examination of procedures

and representative records, ob se rva tions , and interviews with

personnel.

Nc items of noncempliance with NRC requirements were identified

during the course of this inspection.

In accordance with Section 2.790 of the NEC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this

letter and the enclosed inspection report will be placed in the

NRC's Public Document Rocc, except as follows.

If this report

contains information that you or your contractors believe to

be proprietary, you must apply in writing to this office, with-

in twenty days of ycur receipt of this letter, to withhold

information frca public disclosure.

The application must

include a full statement of the reasons for which the infor-

mation is considered proprietary, and should be prepared so

that proprietary information identified in the application

is centained in an enclosure to the application.

_

'

M'424

090

7007260Cd

'

.

.

Wisconsin Electric Power

-2-

Company

HAY 7

1979

We will galdly discuss any questions you have concerning this

inspection.

Sincerely.

0J

/1 g 4p e5',

'

R. F. Heish=an, Chief

/[v,

Reactor Operations and

/

Nuclear Support Franch

Enclosure:

IE Inspection

Report No. 50-301/79-06