rT@
,saa c/
UNITED STATES f.-
NUCLEAR REGULATORY COMMISSION
'4 E
Rl E REGION til g$ g [
799 ROOSEVELT ROAD g,
GLE N E LLYN, ILLINOIS 60137 4
July 6, 1979 Docket No. 50-266 Docket No. 50-301 Wisconsin Electric Power Company ATTN:
Mr. Sol Burstein Senior Executive Vice President Power Plants 231 West Michigan Milwaukee, WI 53201 Gentlemen:
This Information Notice is provided as an early notification of a possibly significant matter.
It is expected that recipients will review the infor-mation for possible applicability to their facilities. No specific action or response is requested at this time.
If you have questiens regarding this matter, please contact the Director of the appropriate NRC Regional Office.
Sincerely, O
h0 James C. Keppler Director
Enclosure:
IE Information Notice No. 79-18 cc w/ encl:
Mr. G. A. Reed, Plant Manager Central Files C. M. Trammel, ORB /hTR Director, NRR/ DPM Direetor, NRR/ DOR PDR Local PDR NSIC TIC Sandra A. Bast, Lakeshore Citizens for Safe Energy
-O 3
't 907240 n s
U.S. NUCLEAR REGULATORY COMMISSION OftICE OF INSPECTION AND ENFORCEMENT REGION III July 6, 1979 IE Information Notice No. 79-18 SKYLAB REENTRY Description of Circumstances:
The most recent dates for reentry of Skylab are July 10 to 14, 1979, with July 12, as the most probable date.
Recognizing that a hit on a nuclear nower plant would be highly unlikely by Skyleb debris, the NRC believes it would be prudent for licensees to review their contingency plans in case such an event should actually occur.
The NRC is in communication with the Department of Energy (DOE), and will receive notification from them as soon as the reentry corridor can be established.
This notification may occur within 1 to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> before reentry actually occurs.
If it is determined that there are any licensed nuclear power plar ts in the reentry corridor, the plants will receive notification from their respective Regional Office via the dedicated phone line.
This Information Notice is provided as an early nctification of a possibly significant matter.
It is expected that recipients will review the informa-tion for possible applicability to their facilities. No specific action or response is requested at this time.
If further NRC evaluations so indicate, an IE Circular or Bulletin will be issued to recommend or request specific licnesee actions.
If you have questions regarding the matter, please contact the Director of the appropriate NRC Regional Office.
No written response to this information notice is required.
1 7l'\\
15(3>
7907120387
IE Information Notice No. 79-18 Enclosure July 6, 1979 Page 1 of 2 LISTING OF IE INFORMATION NOTICES TSSUED IN 1979 Information Subject Date Issued To Notice No.
Issued 79-01 Bergen-Paterson Hydraulic 2/2/79 All power reactor Shock and Sway Arres6 r facilities with an OL or a CP 79-02 Attempted Extortion -
2/2/79 All Fuel Facilities Low Enriched Uranium 79-03 Limitorque Valve Geared 2/9/79 All power reactor Limit Switch Lubricant facilities with an OL or a CP 79-04 Degradation of 2/16/79 All power reactor Engineered facilities with an Safety Features OL or a CP 79-05 Use of leproper Materials 3/21/79 All power reactor in Safety-Related Compocants facilities with an OL or CP 79-06 Stress Analysis of 3/23/79 All Holders of Safety-Related Piping Reactor OL or CP
~ 79-07 Rupture of Radwaste Tanks 3/26/79 All power reactor far.ilities with an OL or CP 79-08 Interconnection of 3/28/79 All power reactor Contaminated Systems with facilities with an Service Air Systems Used OL and Pu Processing As the Source of Breathing fuel facilities Air 79-09 Spill of Radioactively 3/30/79 All power reactor Contaminated Resin facilitim. with an OL 79-10 Nonconforming Pipe 4/16/79 All power reactor Support Struts facilities with a CP 79-11 Lower Reactor Veesel Head 5/7/79 All holders of Reactor Insulation Support Problem OLs and cps
., r
') ; -)
.7, ;
s -
IE Information Notice No. 79-18 Enclosure July 6, 1979 Page 2 of 2 LISTING OF IE IbFORMATION NOTICES IoSUED IN 1979 Irtornation Subject Date Issued To
- 4otice Nr Issued 79-12 Attempted Damage to New 5/11/79 All Fuel Facilities Fuel Assemblies Research Reactors, and Power Reactors with an OL or CP 79-13 Indication of Low Water 5/29/79 All Holders of Reactor Level in the Oyster Creek OLs and cps Reactor 79-14 NRC Position of Electrical 6/11/79 All Power Reactor Cable Support Systems Facilities with a CP 79-15 Deficient Procedures 6/7/79 All Holders of Reactor ole and cps 79-16 Nuclear incident at Three 6/22/79 All Research Reactors Mile Is_and and Test Reactors with OLs 79-17 Source Holder Assembly Damage 6/20/79 All Holders of Reactor Damage From Misfit Between OLs and cps Assembly and Reactor Upper Grid Plate 13tib
'