Forwards IE Insp Repts 50-518/79-10,50-519/79-10, 50-520/79-10 & 50-521/79-10 on 790507-10.No Noncompliance Noted
ML19246C276
Person / Time
Site: Hartsville  Tennessee Valley Authority icon.png
Issue date: 05/18/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19246C277 List:
References
NUDOCS 7907240084
Download: ML19246C276 (2)


See also: IR 05000518/1979010

Text

e/ ./ C

6

UNITED sT ATEs

>R 8800

NUCLEAR REGULATORY COMMISSION

og

REGloN 11

2

),

g

101 M ARIETT A sTREEY.N.W.

d.b

'

.

3

r

r

ATLANT A. GEORGI A 3o303

[

p

'

'*% . *

liAY 18 s79

In Reply Refer To:

RII:TEB

50-518/79-10

50-519/79-10

50-520/79-10

50-521/79-10

Tennessee Valley Authority

Atto:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, Tennessee 37401

Gentlemen:

This refers to the inspection conducted by T. E. Burdette of this office

of activities authorized by NRC Construction Permit

on May 7-10, 1979

Nos. CPPR-150, CPPR-151, CPPR-152 and CPPR-153 for the Hartsville Nuclear

facility, Units A1, A2, B1 and B2, and to the diacussion of our

Plant

findings held with R. T. Hathcote at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

Within these areas, the inspection

the enclosed inspection report.

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

We have examined actions you have taken with regard to previously identi-

These are discussed in the enclosed inspection

fied enforcement matters.

report.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

contains any infonnation that you (or

Document Room.

If this report

is necessary that you

your contractor) believe to be proprietary, it

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application sust

is

include a full statement of the reasons on the basis of which it

7Z

me

Ju'

-

a LD

79073400cf

.

MAY 18 B79

f

-2-

Tennessee Valley Authority

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

If we do not hear from you in this

in a separate part of the document.

regard within the specified period, the report will be placed in the

Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

e3

7t'

I

Charles E. Murphy, Chief

Reactor Cc.nstruction and

Engineering Support Branch

Enclosures:

Inspection Report Nos. 50-518/79-10,

50-519/79-10, 50-529/79-10 and

50-521/79-10

cc w/ enclosures:

J. E. Gilleland

Assistant Manager of Power

500C Chestnut Street Tower II

Chattanooga, Tennessee 37401

R. T. Hathcote, Project Manager

Post Office Bcx 2000

Hartsville, Tennessee 37074

J. f. Cox

400 Commerce Street

W9D214

Knoxville, Tennessee 37902

J. E. Wills, Project Engineer

400 Chestnut Street Tower Il

Chattanooga, Tennessee 37401

363

205