,,$ " ' G tyo IJNITED S TATES e
- ,. 4770[0.' p'p, E ' g,. (
NUCLE AR REGULATORY COMMISSION REGION V C; ~ *v),.[ $ r' [
1990 N. C AllT OllNI A COUL E V Af tD
g,,
[
SUIT E 202. WALNUT CilE E K PLAZA WAL NUT Cillf.K, C ALI?OFINI A 94396 July 6,1979 Docket flo. 50-187 florthrop Corporation One Research Park Palos Verdes, California 90274 Attention:
W. E. Crandall Chief Scientist Gentlemen:
This Information fictice is provided as an early notification of a possibly significant matter.
It is expected that recipients will review the informa-tion for possible applicability to their facilities. flo specific action or response is requested at this time.
If you have questions regarding this matter, please contact the Director of the appropriate f!RC Regional Office.
Sincerely, l.?? 'I
, ( LL -
R. H. Engelken Director
Enclosure:
IE Infornation flotice fio. 79-18 t
359 322
,3,3 i
(p) 7 907280
UNITED STATES NUCLEAR REGULATORY C0!"iISS19 0FFICE OF INSPECTIO:I AND ENFORCFf1Etli WASHINGTON, D.C.
20555 July 6, 1979 IE Inforration Notice fio. 79-18 SKYLAB REEtlTRY Description of Circunstances:
The most recent dates for reentry of Skylab are July 10 to 14,1979, with July 12, as the most probable date.
Recognizing that a hit on a nuclear power olant would be highly unlikely by Skylab debris, the NRC believer it would be prudent for licensees to review their contingency plans ln case
';uch an event should actually occur.
The NRC is in communication with the Department of Energy (DOE), and will receive notificaticr. from them as soon as the reentry corridor can be established.
This noti', cation may occur within 1 to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> before reentry actually occurs.
If it is deternined that there are any licensed nuclear power plarts in the rcentry corridor, the plants will receive notification frcm their respective Regional Office via the dedicated phone line.
This Infornation Notice is provided as an early notification of a possibly significant ratter.
It is expected that recipients will review the informa-tion for possible applicability to their facilities, fio specific action or response is requested at this time.
If further NRC evaluations so indicate, an IE Circular or Bulletin will be issued to recommend or request specific licnesee actions.
If you have questions regarding the matter, please contact the Director of the appropriate NRC Regional Office.
No written response to this information notice is required.
Enclosure:
List of IE Information flotices Issued in 1979 359 323 79071 20387
IE Information f;otice fio. 79-18 Enclosure July 6, 1979 Page 1 of 2 LISTING OF IE If; FORMATION f;0TICES ISSUE 0 IN 1979 Information Subject Date Issued To Notice fio.
Issued 79-01 Bergen-Paterson Hydraulic 2/2/79 All power reactor Shock and Sway Arrestor facilities with an OL o; a CP 79-02 Attempted Extortion -
2/2/79 All Fuel Facilities Low Enriched Uranium 79-03 Linitcrcue Valve Geared 2/9/79 All power reactor Linit Switch Lubricant facilities with an OL or a CP 79-04 Degradaticn of 2/16/79 All power reactor Engineered facilities with an Safety Features OL or a CP 79-05 Use of Improper Materials 3/21/79 All power reactor in Safety-Related Components facilities with an OL or CP 79-06 Stress Analysis of 3/23//9 All Holders of Safety-Related Piping Reactor OL or CP 79-07 Rupture of Radwaste Tanks 3/26/79 All power reactor facilities with an OL or CP 79-03 Interconnection of 3/28/79 All power reactor Contaminated Systems with facil. ties with an Service Air Systems Used OL and Pu Processing As the Source of Breathing fuel facilities Air 79-09 Spill of Radioactively 3/30/79 All power reactor Contaminated Recin facilities with an OL 79-10 Nonconforming Pipe 4/16/79 All power reactor Support Struts facilities with a CP 79-11 Lower Reactor Vessel Head 5/7/79 All holders of Reactor Insulation Support Problen OLs and cps 359 324
s IE Information flotice flo. 79-18 Enclosure July 6,1979 Page 2 of 2 LISTING OF IE INFORMATION f!0TICES ISSUED Ill 19 9 i
Information Subject Datm Issued To flotice flo.
Issued 79-12 Attempted Damage to fiew 5/11/79 All Fuel Facilities Fuel Assenblies Research Reactors, and Power Reactors with an OL or CP 79-13 Indication of Low Water 5/29/79 All Holders of Reactor Level in the Oyster Creek OLs and cps Reactor 79-14 f;RC Position of Electrical 6/11/79 All Power Reactor Cable Support Systems facilities with a CP 79-15 Deficient Procedures 6/7/79 All Holders of Reactor OLs and cps 79-16 fuclear Incident at Three 6/22/70 All Research Reactors Mile Island
- d Test Reactors u :h OLs 79-17 Source Holder Assembly Danage 6/20/79 All Holders of Reactor Damage Fron Misfit Between OLs and cps Assembly and Reactor Upper Grid Plate 359 325