Forwards IE Insp Repts 50-456/79-05 & 50-457/79-05 on 790419-20 & 26-27.No Noncompliance Noted
ML19246C210
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 05/30/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML19246C211 List:
References
NUDOCS 7907230741
Download: ML19246C210 (2)


See also: IR 05000456/1979005

Text

t

UNITED STATES

.

p*MG O

UUCLEAR REGULATORY COMMISSION

f

..

,

.

[

t(i 3

REGION til

3

'

5

.

f

,

799 ROOSEVELT RO AD

t

'

f

CLEN ELLYN ILLINol5 60137

%, . .w.s

gs

c.

MAf 3 01979

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN:

Mr. Byron Lee, Jr.

Vice President

P. O. Box 767

Chicago, IL 60690

Gentlemen:

This refers to the inspection conducted by Messrs. G. Maxwell,

P. Barrett and Mr. C. Jones on April 19-20, 1979, and by Mr. C. Jones

on April 26-27, 1979, of activities at Braidwood Nuclear Power

Station, Units 1 and 2, authorized by NRC Construction Permits ho.

CPPR-132 and No. CPPR-133 and to the discussion of our findings with

Mr. R. Cosaro and others of your staff at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

No items of noncompliaace with NRC requirements were identified

during the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's

Public Document Room, except as follows.

If this report contains

information that you or your contractors believe to be proprietary,

you must apply in writing to this office, within twenty days of your

receipt of this letter, to withhold uch information from public

disclosure. The application must include a full statement of the

reasons for which the information is considered proprietary, and

should be prepared so that proprietary information identified in the

application is contained in an enclosure to the application _

7907 23 o 7 yy

359

286

9

Commonwealth Edison

~

-2-

MAY 3 01975

Company

.

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Iaspection

Reports No. 50-456/79-05 and

No. 50-457/79-05

c w/ encl:

Mr. R. Cosaro, Project

Superintendent

Central Files

Teproduction Unit hTC 20b

PDR

Local PDR

NSIC

TIC

Mr. Dean Hansell, Office of

Assistant Attorney General

359

287