Text
t
UNITED STATES
.
p*MG O
UUCLEAR REGULATORY COMMISSION
f
..
,
.
[
t(i 3
REGION til
3
'
5
.
f
,
t
'
f
CLEN ELLYN ILLINol5 60137
%, . .w.s
gs
c.
MAf 3 01979
Docket No. 50-456
Docket No. 50-457
Commonwealth Edison Company
ATTN:
Mr. Byron Lee, Jr.
Vice President
P. O. Box 767
Chicago, IL 60690
Gentlemen:
This refers to the inspection conducted by Messrs. G. Maxwell,
P. Barrett and Mr. C. Jones on April 19-20, 1979, and by Mr. C. Jones
on April 26-27, 1979, of activities at Braidwood Nuclear Power
Station, Units 1 and 2, authorized by NRC Construction Permits ho.
CPPR-132 and No. CPPR-133 and to the discussion of our findings with
Mr. R. Cosaro and others of your staff at the conclusion of the
inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted
of a selective examination of procedures and representative records,
observations, and interviews with personnel.
No items of noncompliaace with NRC requirements were identified
during the course of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter
and the enclosed inspection report will be placed in the NRC's
Public Document Room, except as follows.
If this report contains
information that you or your contractors believe to be proprietary,
you must apply in writing to this office, within twenty days of your
receipt of this letter, to withhold uch information from public
disclosure. The application must include a full statement of the
reasons for which the information is considered proprietary, and
should be prepared so that proprietary information identified in the
application is contained in an enclosure to the application _
7907 23 o 7 yy
359
286
9
Commonwealth Edison
~
-2-
MAY 3 01975
Company
.
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
G. Fiorelli, Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
IE Iaspection
Reports No. 50-456/79-05 and
No. 50-457/79-05
c w/ encl:
Mr. R. Cosaro, Project
Superintendent
Central Files
Teproduction Unit hTC 20b
Local PDR
Mr. Dean Hansell, Office of
Assistant Attorney General
359
287