Forwards IE Insp Rept 50-348/79-18 on 790424-27.No Noncompliance Noted
ML19246B804
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 05/10/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Clayton F
ALABAMA POWER CO.
Shared Package
ML19246B805 List:
References
NUDOCS 7907180634
Download: ML19246B804 (2)


See also: IR 05000348/1979018

Text

Tl v

.

UNITED STATES

paproO

NUCLEAR REGULATORY COMMISSION

[

,0,,

R EGloN 11

g",fa[' ~ r

b

(

g

101 M ARIETT A STR E ET, N.W.

5

.

  • g 'b

ATL ANTA, GEORGIA 303c3

o

MAY 101979

.....

.

In Reply Refer To:

RII:AKH

50-348/79-18

Alabama Power Company

ATTN:

F. L. Clayton, Jr.

Senior Vice President

P. O. Box 2641

Birningham, AL 35291

Gentlemen:

This refers to the inspection conducted by A. K. Hardin of this office on

April 24-27, 2979, of activities authorized by hTC License No. NPF-2 for the

Farley Unit I facility, and to the discussion of our findings held with

J. D. Woodard at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report.

This item will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Dccument Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within

20 .ays to this office to withhold such information from public disclosure.

Any such application must include a full statement of the reasons on the

basis of which it is claimed that the information is proprietary, and should

be prepared so that proprietary information identified in the application is

contained in a separate pa.t of the document.

If we do not hear from you in

this regard within the specified period, the report will be placed in the

'

Public Document Room.

3kk

m

'i

7 9 0718 063f

.

.-

.

'

.

Alabama Pcwer Company

-2-

MAY 101979

,

Should you have any questions concerning this letter, we will be glad to

discuss then with you.

Sincerely,

$ l.

t

R. C.

ewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosure:

Inspection Report No. 50-348/79-18

cc w/ enc 1:

A. R. Barton

Executive Vice President

P. O. Box 2641

Birmingham, AL 35291

H. O. Thrash

Manager-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

C. Biddinger, Jr.

.

Manager-Corporate Quality Assurance

P. O. Box 2641

Birmingham, AL 35291

W. G. Hairston, III

} $ k 2_h2.

Plant Manager

Drawer 470

Ashford, AL 36312

R. E. Hollands, Jr.

QA Supervisor