ML19246B390

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-327/79-22 on 790329-30 & 0406. No Noncompliance Noted
ML19246B390
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 05/10/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19246B391 List:
References
NUDOCS 7907130356
Download: ML19246B390 (2)


See also: IR 05000327/1979022

Text

4

'

W MG

UNITED STATES

NUCLE AR REGULATORY COMMISSION

o,,

REGION 11

& De( #

c-

{ g C j[n $

101 M ARIETT A STREET.N.W.

g.gv4#[

ATLANTA. GEORGI A 30303

g

g**..**

MAY 101979

.

In Reply Refer To:

RII:HLW

50-327/79-22

Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga , TN 37401

Gentlemen:

This refers to the inspection conducted by H. L. Whitener and T. Donat of

this of fice on March 29-30 and April 6,1979, of activities authorized by

NRC Construction Permit No. CPPR-72 for the Sequoyah I facility, and to the

discussion of our findings held with C. Cantrell at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted

of selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copf of this letter and the enclosed

If

inspection report will be placed in the NP,C's Public Document Room.

this report contains any information that you (or your contractor) believe

to be p roprieta ry , it is necessary that you make a written application

within 20 days to this office to withhold such information from public

disclosure.

Any such application must include a full statement of the

reasons on the basis of which it is claimed that the information is proprie-

tary, and shou)

be prepared so that proprietary inforcation identified in

If we do

the application .s contained in a separate part of the document.

not hear from you in this regard within the specified period, the report

will be placed in the Public Document Room.

361

100

(

7 9 07130 36d'

.

.

.

.

Tennessee Valley Authority

-2-

MAY 101979

,

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

/f.dC

sb

R. C. Lewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosure:

Inspection Report No.

50-327/79-22

cc w/ encl:

J. E. Gi11 eland

Assistant Manager of Power

500C Chestnut Street Tower II

Chattanooga, TN 37401

G. G. Stack, Project Manager

P. O. Box 2000

Daisy, TN 37319

J. M. Ballentine

Plant Superintendent

P. O. Box 2000

Daisy, TN 37319

,

J. F. Cox

400 Commerce Street

W10C131 C

Knoxville, TN 37902

D. L. Lambert, Project Engineer

400 Chestnut Street Tower II

Chattanooga, TN 37401

i

361

101

n

_ _ , , . . . _

m

-

--

.