ML19246B318

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-070/79-01.No Noncompliance Noted
ML19246B318
Person / Time
Site: Vallecitos File:GEH Hitachi icon.png
Issue date: 05/04/1979
From: Crews J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Darmitzel R
GENERAL ELECTRIC CO.
Shared Package
ML19246B319 List:
References
NUDOCS 7907130171
Download: ML19246B318 (2)


See also: IR 05000070/1979001

Text

/b

    1. *'%,

uni t E D STATES

t

NUCLEAR HEGULATORY COMMisslON

g

1,.

3

/

f

f7

itEc!oN v

0

A

,,

SU110 202, W AL : sT'

ECK PL AZ A

z,,

j

M90 N. C AllFOR NI A B0ULEV A R D

    • ,e*

W ALNUT CRE EK, C ALIFORNI A 94590

i

,

. . ,

Docket tio. 50-70

General Electric Company

Vallecitos fluclear Center

P. O. Box 460

Pleasanton, California 94566

Attention: Mr. R. W. Darmitzel, flanager

Irradiation Processing Product Section

Gentlemen:

Subj ect:

flRC Inspection of GETR Facility

This refers to the inspection conducted by Messrs. H. L. Canter and

G. W. Johnston of this office on flarch 27-29, 1979, of activities

authorized by fiRC License fio. TR-1 and to the discussion of our find-

ings held by Mr. Johnston with Mr. Ketchel and other members of your

staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report.

Within these areas, the inspection consisted of

i

selective examinations of procedures and representative records, inter-

views with personnel, and observations by the inspectors.

f!o items of noncompliance with fiRC requirements were identified within

the scope of this inspection.

In accordance with Section 2.790 of the flRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspectioq report will be placed in the fiRC's Public

Document Room.

If this report contains any information that you believe

to be proprietary, it is necessary that you submit a written application

to this office, within 20 days of the date of this letter, requesting

that such information be withheld from public disclosure.

The applica-

tion mast include a full statement of the reasons why it is claimed that

u6

ra

-x

7907130llI

j

!

l

.

General Electric Company

-2-

MAY

4 373

the information is proprietary. The application should be prepared o

that any proprietary information identified is contained in an enclos *e

to the application, since the application without the enclosure will

also be placed in the Public Document Room.

If we do not hear from you

in this regard within the specified period, the report will be placed in

ti.e Public Document Room.

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Si ncei'ely,

thkj-

ffi.de--

p',,o J. L. Crews, Chief (d

Reactor Operations an

fluclear Support Branch

inclosure:

It Inspection Report

tio. 50-70/79-01

cc w/o enclosure:

William A. Smith,ftanager

fluclear Safety and Quality Assurance, GE

D. L. Gilliland,flanager

Reactor Irradiation, GE

t

t

l

I

!

4.26

\\66