ML19246A563
| ML19246A563 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 06/25/1979 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Gilbert R Office of Nuclear Reactor Regulation |
| References | |
| PVNGS-309-JRM-J, NUDOCS 7907030370 | |
| Download: ML19246A563 (3) | |
Text
%
A*
f
( g> '
-zum wuac mwm oms-m x
P. Q. B O X 21666 PH O E NI X, A RIZC N A,8 5 0 3 6 June 25, 1979 PVNGS-309-JRM/JMA Dr. Robert A. Gilbert Nuclear Regulatory Commission U.
a of fice of the Nuclear Reactor Regulation
% shington, D. C.
20555
Subject:
Docket Nos. STN 50-592/593, Draft Environmental Statement (DES), Related to Construction of Palo Verde Nuclear Generating Station, Units 4 and 5 File:
FF-79-054-026
Dear Dr. Gilbert:
Enclosed, are Joint Applicants' and their Consultan".s' additional cor=ents on the subject DES, pursuant to 10CFR51 and NRC Notice Number 7590-01, dated April 19, 1979.
Very trul yor
( Q af c,L.
Qt.A O ntJ).
E. E. Van Brunt, Jr.
APS Vice President Nuclear Project.s ANPP Project Director EEVBJr/JRM:ske Enclosure 7907030370 S
BMv4tB i)
ADDITIONAL C0} DENTS ON DES FOR PVNGS UNITS 4 AND 5 DOCKETS STN 50-592/593 Page 8-1:
Section 8.1.1, Sixth Line in Table:
Change "LADPW" to "LADWP".
Pace 3-2:
Table 8-1:
Area served for LADWP should be 465 mi2, not A/10,000.
Page S-5:
Table 8-4:
The data for APS and SDGE are in error based upon the data submitted in ER-CP, PVNGS Units 4 & 5, Table 1.2-8, Sheets 3 and 4 of 17.
The data for APS should be changed as follows:
Combined Cycle Oil Comb. Turbine 1978 1992 1978 1992 1978 1992 225 225 576 576 511 861 The data for SDGE should ae changed as follows:
Nuclear Comb. Turbine Hydro 1978 1992 1978 1992 1978 1992 0
659 368 368 0
0 Pace 9-4:
Section 9.1.2.1, Second Paraaraph:
Change 500 KW to 283 IG.
Page 9-5:
Section 9.1.2.3, Second Paraerach, First Line:
Add "down-hole" between "with" and " fluid".
Pace 9-11:
Table 9-4:
Fercent increase per year for coal and uranium is shown to be 5 and 9, respectively. The applicant's "in-L,use" studies indicate these estimat2d price increases to be 6 and 5, respectively, the significance of which is a reversal of the projected cost escalation difference q9 favoring nuclear versus coal.
/-
h
e
- Page
'-11:
Section 9.1.2.7, Paragraoh 17-It is stated that the coal price FOB western mines (surface) is about 60.25 per million Stu.
Thia figure appears to be icw.
For example, the following is a list of several coal prices, FOB mine:
Four Corners Savajo Mine
$0.37/mm3tu Navajo Black Mesa Mine
$0.50/mnBtu Cholla McKinley Mine
$0.70/m= Btu e
i.
_s h
.