Draft Safety Evaluation for NEDC-33173p Supplement 6 - Applicability of General Electric Methods to Expanded Operating Domains - Removal of the Safety Limit Minimum Critical Power Ratio Penalty
ML19071A101
Person / Time
Site: 99902024
Issue date: 03/26/2019
From: Dennis Morey
NRC/NRR/DLP/PLPB
To: Michelle Catts
GE Hitachi Nuclear Energy
Golla J, NRR/DLP/PLPB, 415-1002
References
EPID L-2017-TOP-0040
Download: ML19071A101 (4)


Text

OFFICIAL USE ONLY - PROPRIETARY INFORMATION March 26, 2019 Ms. Michelle P. Catts Senior Vice President, Regulatory Affairs GE-Hitachi Nuclear Energy Americas, LLC P.O. Box 780, M/C A-10 Wilmington, NC 28401-0780

SUBJECT:

DRAFT SAFETY EVALUATION FOR NEDC-33173P SUPPLEMENT 6 -

APPLICABILITY OF GENERAL ELECTRIC METHODS TO EXPANDED OPERATING DOMAINS - REMOVAL OF THE SAFETY LIMIT MINIMUM CRITICAL POWER RATIO PENALTY (EPID L-2017-TOP-0040)

Dear Ms. Catts:

By letter dated September 15, 2017 (Agencywide Documents Access and Management System Accession No. ML17261A068), General Electric Hitachi Nuclear Energy (GEH) submitted NEDC-33173P, Supplement 6, Applicability of GE Methods to Expanded Operating Domains -

Removal of the Safety Limit Minimum Critical Power Ratio (SLMCPR) Penalty, to the U.S.

Nuclear Regulatory Commission (NRC) staff for review. Enclosed for GEH review and comment is a copy of the NRC staffs draft safety evaluation (SE) for the supplement.

Pursuant to Section 2.390 of Title 10 of the Code of Federal Regulations (10 CFR), we believe that the enclosed draft SE may contain proprietary information. However, we have not marked the specific proprietary information and are providing you with the opportunity to comment on the proprietary aspects. If you believe that any information in the enclosure is proprietary, please identify such information line-by-line and define the basis pursuant to the criteria of 10 CFR 2.390. Twenty working days are provided for you to comment on the proprietary aspects and any factual errors or clarity concerns contained in the draft SE. The final SE will be issued after making any necessary changes and a non-proprietary version will be made publicly available. The NRC staffs disposition of your comments on the draft SE will be discussed in the final SE.

To facilitate the NRC staffs review of your comments, please provide a marked-up copy of the draft SE showing proposed changes and provide a summary table of the proposed changes.

NOTICE: The enclosure transmitted herewith contains Proprietary Information.

When separated from the enclosure, this transmittal document is decontrolled.

OFFICIAL USE ONLY - PROPRIETARY INFORMATION

OFFICIAL USE ONLY - PROPRIETARY INFORMATION M. Catts If you have any questions, please contact Joseph Golla at 301-415-1002.

Sincerely,

/RA/

Dennis C. Morey, Chief Licensing Processes Branch Division of Licensing Projects Office of Nuclear Reactor Regulation Docket No. 99902024

Enclosure:

Draft SE OFFICIAL USE ONLY - PROPRIETARY INFORMATION

OFFICIAL USE ONLY - PROPRIETARY INFORMATION cc w/o encl.:

Mr. Kent E. Halac Senior Project Manager, Regulatory Affairs GE-Hitachi Nuclear Energy Americas, LLC P.O. Box 780, M/C A-70 Wilmington, NC 28401-0780 Kent.Halac@ge.com Dr. Brian R. Moore General Manager, Core & Fuel Engineering Global Nuclear Fuel-Americas, LLC P.O. Box 780, M/C A-75 Wilmington, NC 28401-0780 Brian.Moore@ge.com Ms. Lisa K. Schichlein Senior Project Manager, Regulatory Affairs GE-Hitachi Nuclear Energy Americas, LLC P.O. Box 780, M/C A-70 Wilmington, NC 28401-0780 Lisa.Schichlein@ge.com OFFICIAL USE ONLY - PROPRIETARY INFORMATION

ML19071A101 (Letter);

ML19071A113 (Proprietary Draft SE);

ML19071A119 (Package) *concurrence via e-mail NRR-043 OFFICE NRR/DLPPLPB/PM NRR/DLPPLPB/LA* NRC/DSS/SNPB/BC NRR/DLPPLPB/BC NAME JGolla DHarrison RLukes DMorey DATE 3/26/2019 3/21/2019 3/26/2019 3/26/2019