Review of Steam Generator Tube Inspection Report for Refueling Outage 24
ML19242D608
Person / Time
Site: Saint Lucie 
Issue date: 09/16/2019
From: Michael Wentzel
Plant Licensing Branch II
To: Moul D
Florida Power & Light Co
Wentzel M, NRR/DORL/LPL2-2
References
EPID L-2019-LRO-0023
Download: ML19242D608 (3)


Text

Mr. Don Moul Vice President, Nuclear Division and Chief Nuclear Officer Florida Power & Light Company Mail Stop: NT3/JW 15430 Endeavour Drive Jupiter, FL 33478 UNITED STATES WASHINGTON, D.C. 20555-0001 September 16, 2019

SUBJECT:

ST. LUCIE PLANT, UNIT NO. 2-REVIEW OF STEAM GENERATOR TUBE INSPECTION REPORT FOR REFUELING OUTAGE 24 (EPID L-2019-LR0-0023)

Dear Mr. Moul:

By letter dated March 22, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19081A146), as supplemented by letter dated August 21, 2019 (ADAMS Accession No. ML19233A273), Florida Power & Light Company (the licensee) submitted information summarizing the results of the fall 2018 steam generator (SG) inspections performed at St. Lucie Plant, Unit No. 2. These inspections were performed during Refueling Outage 24.

The U.S. Nuclear Regulatory Commission (NRC) staff completed its review of the submittal and concluded that the licensee provided the information required by the Technical Specifications.

No additional follow-up is required at this time. This completes the NRC staff efforts for EPID L-2019-LR0-0023. The enclosure documents the NRC staff's review of the submittal.

Docket No.

50-389

Enclosure:

Fall 2018 Steam Generator Tube Inspection Report cc: Listserv Sincerely, J fUv~* /

Michael J. W ntzel Project Manager Plant Licensing nch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

REVIEW BY THE OFFICE OF NUCLEAR REACTOR REGULATION FALL 2018 STEAM GENERATOR TUBE INSPECTION REPORT FLORIDA POWER & LIGHT COMPANY ST. LUCIE PLANT, UNIT NO. 2 DOCKET NO. 50-389 By letter dated March 22, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19081A146), as supplemented by letter dated August 21, 2019 (ADAMS Accession No. ML19233A273), Florida Power & Light Company (the licensee) submitted information summarizing the results of the fall 2018 steam generator (SG) inspections performed at St. Lucie Plant, Unit No. 2. These inspections were performed during Refueling Outage 24.

St. Lucie Plant, Unit No. 2, has two Model 86/19TI replacement SGs that were manufactured by AREVA and installed in 2007. Each SG has 8,999 thermally treated Alloy 690 tubes with a nominal outside diameter of 0.75 inches and a nominal wall thickness of 0.043 inches. During manufacturing, all tubes were hydraulically expanded at both ends over the full depth of the tubesheet. The tubesheet was drilled on a triangular pitch with tube center-to-center spacing of 1.0 inch. The radius of the row 1 U-bends is 4.134 inches. The U-bends in rows 1 through 15 were stress-relieved after bending. Seven Type-410 stainless tube steel support plates, each 1.181 inches thick with broached trefoil holes, support the vertical section of the tubes. Four sets of anti-vibration bars, each 0.112 inches thick and made from Type-405 stainless steel, support the U-bend section of the tubes.

The licensee provided the scope, extent, methods, and results of its SG tube inspections in the documents referenced above. In addition, the licensee described corrective actions (e.g., tube plugging) taken in response to the inspection findings.

Based on a review of the information provided, the U.S. Nuclear Regulatory Commission (NRC) staff concludes that the licensee provided the information required by its technical specifications. In addition, the NRC staff concludes there are no technical issues that warrant additional follow-up action at this time. This conclusion is based on the fact that the inspections appear to be consistent with the objective of detecting potential tube degradation, and the inspection results appear to be consistent with industry operating experience at similarly designed and operated units. Although the number of wear indications is greater than the number of wear indications found at other AREVA SGs of similar age, the depths of these indications (i.e., the severity) are comparable to those observed at other plants.

Enclosure

ML19242D608

  • b e-mail OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NRR/DMLR/MCCB/BC NAME MWentzel LRonewicz SBloom 09/03/19 09/03/19 08/28/19 NRR/DORL/LPL2-2/BC NRR/DORL/LPL2-2/PM UShoop MWentzel 09/14/19 09/16/19