Forwards IE Insp Repts 50-321/79-16 & 50-366/79-20 on 790605-08.No Noncompliance Noted
ML19242D545
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 06/25/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19242D537 List:
References
NUDOCS 7908150400
Download: ML19242D545 (2)


See also: IR 05000321/1979016

Text

o

a arcg'o

r

f

UNITED ST ATES

E '*

,s , $* 3

NUCLEAR REGl3LATORY COMMISSION

E

REGION 11

$ , M, ;y 5

'

'

o,,

f

101 M ARIE TT A sT., N W., SUITE 3100

'N/

p

ATLANT A, GEORGI A 30303

.....

In Reply Refer To:

JUN 2 51979

RII:BTM

30-321/79-16

50-366/79-20

Georgia Power Company

Attn:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, Georgia 30303

,

Gentlemen:

Thi:: refers to the inspection conducted by B. T. Moon of this office on

June 5-8, 1979 of activities authorized by NRC License Nos. DPR-57 and

NPF-5 for the Hatch facility, Units 1 and 2, and to the discussion of

our findings held with M. Manry at the conclusion of the inspection.

Areas examined during the inspecticr. and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncon,pliance were

disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. A L ,, such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

.

G3035'7-

631002

79081509OO

p

.

.

t

Georgia Power Company

-2-

JUN 2 51979

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

E. c. ,&

R. C.

ewis, Acting Chief

Reactor Operations and

Nuclear Support Branch

Enclosures:

Inspection Report Nos. 50-321/79-16

and 50-366/79-20

cc w/ enclosures:

M. Manry, Plant Manager

Post Office Box 442

Baxley, Georgia 31513

C. E. Belflower

Site QA Supervisor

Post Office Box 442

Baxley, Georgia 31513

M3

.

631003