05000271/LER-1979-014-03, /03L-0 on 790712:during Surveillance Testing of Drywell to Torus Vacuum Breakers,Loss of Containment Air Monitor Occurred.Caused by Corrosion Seizure of Vanes.Spare Pump Was Installed & Failed Pump Repaired

From kanterella
(Redirected from ML19242D176)
Jump to navigation Jump to search
/03L-0 on 790712:during Surveillance Testing of Drywell to Torus Vacuum Breakers,Loss of Containment Air Monitor Occurred.Caused by Corrosion Seizure of Vanes.Spare Pump Was Installed & Failed Pump Repaired
ML19242D176
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 08/09/1979
From: Conway W
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19242D173 List:
References
LER-79-014-03L, LER-79-14-3L, NUDOCS 7908140658
Download: ML19242D176 (2)


LER-1979-014, /03L-0 on 790712:during Surveillance Testing of Drywell to Torus Vacuum Breakers,Loss of Containment Air Monitor Occurred.Caused by Corrosion Seizure of Vanes.Spare Pump Was Installed & Failed Pump Repaired
Event date:
Report date:
2711979014R03 - NRC Website

text

om n m.,., <,

(7 77)

LICENSEE EVENT REPORT LER 79-l'+/3L

  • JN T ROL H LCr1 l

l l

l l

(PLE ASE PRINT OR TYPE ALL REQUIRED INFOR".1ATION)

Lit E ** '

'3 L1.

  • '..;'.5 4
  • '@l 4l l{ li 1{ 1 @l l

l@

0 0l0 0 l0 [vl T l"IYIS 1lhl-l0{

i0l0 o

1 it, L l C i. ', u t T 19E

-/

.al r

r COTT L j@

0 5

0l0 0 2l711l@l0 7

1 l 2 l 7 l 9 ]@l 0 8ln!91719l@

0 11

>tp; c carr c1

- E T.< n u M

64 t; E T r) A r t 74 v;

No rn00 ABLE Cu,SEQUEN CES h E '. E N T D E S C R I P i i O *.

l I

;es and therefore no consequences to the health and safety of the public.

Similar occurrences were reported as RO 77-33, 76-04 and 75-23.

CAUSE DESgtIPTION A"D CORRECTIVE ACTION The CAM punp is a Conde Milking Machine Company Dri-Ai r !!adel No. 6, dry vane positive displacement pump.

Inoperability of the pump was due to corrosion seizure of the vanes.

A spare pump was installed and the failed pump overhauled.

An engineering review is in progress which is expected to lead to improvement of the reliability of the system.