Forwards IE Insp Rept 50-336/79-12 on 790425-30.No Noncompliance Noted
ML19242C851
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/22/1979
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML19242C852 List:
References
NUDOCS 7908140049
Download: ML19242C851 (2)


See also: IR 05000336/1979012

Text

t'

WC

,

p prog

UNITED STATES

/

o

f4UCLEAR REGULATORY COMMISSION

' ,4

w e

{g})e

g

REGION 1

-

%

C

631 PARK AVENUE

'f

KING O' P 9U$51 A, PENN5YLV ANIA 19404

r

%, -.....a

2 2 JUN 1979

Docket No. 50-336

Northeast Nuclear Energy Company

ATTL

Mr. W. G. Counsil

Vice President - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Connecticut

06101

Gentlemen:

Subject:

Inspection 50-336/79-12

This refers to the inspection conducted by Mr. T. H. Smith of this office on

April 25-30, 1979 at Millstone N" clear Pcwer Station, Unit 2, Waterford, Connec-

ticut of activities authorized by NRC License No. DPR-65 and to the discussions

of our findings held by Mr. Smith with Mr. E. Farrell of your staff at the

conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector, and independent calculations by the inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letrer and the enclosed inspection

report will be placed in the NRC's Public Document Room.

If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must be

accompanied by an affidavit executed by the owner of the information, which

identifies the doc _ ment or part sought to be withheld, and which contains a

statement of reasons which addresses with specificity the items which will be

considered by the Conmission as listed in subparagraph (b) (4) of Section

2.790.

The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from you in

this regard within the specified period, the report will be placed in the Public

Document Room.

1EO

-

'c,

,r

lJ/

'

7 9 0 814 00't1 ;

.

.

I 1979

2 2 JUT gqq

Northeast Nuclear Energy Company

2

No reply to this letter is required; however, if you should have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

v

O fp b b

/

a

Eldon J. Brunner, Chief

Reactor Operations and Nuclear

Support Branch

Enclosure: Office of Inspection and Enforcement Inspection

Report Number 50-336/79-12

cc w/ enc 1:

J. F. Opeka, Station Superintendent

D. G. Diedrick, Manager of Quality Assurance

J. R. Hi==elwright, Licensing Safeguards Engineer

'

4

. ,

\\UU