ML19242C753

From kanterella
Jump to navigation Jump to search
Notifies That Licensees Are Encouraged to Use Initial Notification/Reactor Operations Sys During Drill,If Drill Scenario Requires Initial NRC Notification
ML19242C753
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/09/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jeffery Grant
TOLEDO EDISON CO.
References
NUDOCS 7908130330
Download: ML19242C753 (1)


Text

/

UNITED STATES TIC O'

' 'n NUCLEAR REGULATORY COMMISSION 3 I %)#p) i REGION lil

/[

799 ROOSEVELT ROAD o

s4 e GLEN ELLYN, lLLINOIS 60137

  • g e

..e Docket No. 50-346 M0 Toledo Edison Company ATTN:

Mr. James S. Grant Vice President - Energy Supply Edison Plaza 300 Madison Avenue Toledo, OH 43652 Gentlemen:

We have received several licer.see inquiries regarding the use of the OPX (Initial Notification / Reactor Operations) system during drills.

Licensees are encouraged to use the system if the drill scenario requires initial noti-fication of the hTC; however, care should be exercised in assuring that the NRC Duty Officer is informed that such calls are drills.

Sincerely, b

/ James G. Keppler Director cc:

Mr. T. Murray, Station Superintendent Central Files Reproduction Unit h3C 20b PDR Local PDR NSIC TIC Harold W. Kohn, Power Siting Commission Helen W. Evans, State of Ohio G5b109 790813Ahso