ML19242C664

From kanterella
Jump to navigation Jump to search
Notifies That Review of Safeguards Contingency Plan Involves Consideration of Safeguards Issue,Requiring Payment of Class III Fee.Plans Should Be Submitted by 790823
ML19242C664
Person / Time
Site: Big Rock Point, Palisades  File:Consumers Energy icon.png
Issue date: 07/03/1979
From: Diggs R
NRC OFFICE OF ADMINISTRATION (ADM)
To: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
NUDOCS 7908130167
Download: ML19242C664 (2)


Text

4 TERM

-j m,

OUL031;ig DOC l'ET MGS.52-155 50-255 Consauers Pouar Co any ATT:l: Mr. David l'offnan Assistant.N lear Licensin9 b inistrato-212 Mast Michigan Avenue Jackson, Michigan 49?11 Gentlemen:

i This office has rec'ived a copy of your letter dated 'Mrch 2,1979, which transaitted your Safeouards Contim:ency Plans to tne Mfice of :.: clear "aactor Regulation for revinu and annroval as required by 11 CF.150.3a(d) anj 73. '.;(b) of the Co ainsion's remilations.

De Piar., are for the Uii; :cck Point and i

PalisCas Pl:mts under Facility Licenses LP3-t and.;PP-20.

The sa hittal was j

not acco.; yanied by approval /c:an nont fees as require-! by Section 171.22 of 10 CFR part 177.

?, Oms ts for aprovals anJ/or license at.ana.nent such as identifici aLove shoulti be classificd in the 'anner w t forth in k ctica 170.22.

l Section 170.12(c) requires that your ccmany crovit' a propose j dateroinnion of the aa ndment (aporoval) class, state the basis therefor, ard suhait the l

fee with your auplication for the approval or amendt.ent fcr each plant.

l l

Cased on a preliminary revieu of your Plans, we have deterlined tfiat they l

involva censideration of a safeguards issue requiring a Class III' fe' of l

M,000 for each piant at the tuo sitcs.

Ycu should r>ro:'atly forward to this I

office the two Class III fees totalling ',J.

Fees are oayable to the l

U.S. Nuclaar m ulatory Co: 44ission by check, draft or.loney order.

If after j

the final evaluation of your nians is cc:oleted it is etermined that they were j

incorrectly classifieJ, you uill ha refunJed any overpaynent or billed for i

any additional amount due.

l Your current. Contin ency Plans, and the r.uar:1 Training Plans t;hich are to ba i

subu:itted by luoust 23, 1979, for revicu and a.coroval are not consi A red appli-l cations or filings requasted 1 y the Ec:nission for its convenience for the purpose of siu?lifying or clarifying a license or its appco :ej Technical Spaci-l fications.

Some of the ite. s nou required to le sub itted for reviou and annroval i

are as a result of regulatio.ls v:::ich.:ere pronulgate:1 orior to the hrch

".7, 1973 revision of Part 170 which ad 'ed the nau Section 170.22.

Even tholph a

,1

<*.tO'

~

w 7D 0813 0/67

i k'3 Consumers Power Company.9 a

regulaticn t,ccama effective prior to " arch 23. 1973, this does not n.2an that subuittals ncu received and requirinq review and approval are exempt from fees.

If wa can be of assistanca to you, call 301/ M2-7225.

Sincerely.

Original Signed by:

Ileba M. DirES

!!cba :1. Dicus Facilities Prnar n Coordinator Licens7 Fe, ".aca.nmant Cranch Office of /d 4inistration DISTRIBUTIO:1:

PDR LPDR Reg. Docket Files 50-155/255 LFMB Reactor Files (2)

LFI;B R/F (2)

J3erggren, RSLB Sflowicki, ORB-2 HSmith, ORB-2 RSilver, ORB-2 CJHolloway, LFf;B Rf1Diggs, LF::B 1

I I

i l

n

')(3 0 l

s

, l-1 LFMB:ADM

, LFf'B: AD:t RSLD*

OELD*

  • See 50-331 f ir omc r RtTjggs: sic

!CJHollo.my RClark RFonner concurrences su-a = >

.j o,.f. -..

f.

DATEM

,. )).0.7h.

,[

((g,

,[,,

[7 h.,

, J.,, J,7h.,

MZC TOR.t! 318 O-76) NRCH 0249 W u.a. novs a au sar ensanne onrece :

n e ve - see - re.