Forwards IE Insp Rept 50-344/79-07 on 790301-30 & Notice of Violation.Details Withheld (Ref 10CFR2.790)
ML19242C048
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 04/23/1979
From: Crews J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Goodwin C
PORTLAND GENERAL ELECTRIC CO.
Shared Package
ML19242C046 List:
References
NUDOCS 7908090692
Download: ML19242C048 (2)


See also: IR 05000344/1979007

Text

.

f

L

,

,

'

..

.

fjf

[#

%,P

~

y

UNITED STATES

q-

[g

t

NUCLEAR REGULATORY Commission

'

,

f,'

i

8

SUITE 202. W ALNUT C REEK PL AZ A

-

REGION V

C'

't

'

o

1990 N. C AllFOR NI A BOULEV A R D

9

p

    • ee*

W ALNUT CREEK C ALIFORNI A 94596

APR 2 3 D79

-

c;

Docket flo. 50-344

N

d

'J

_

Portland General Electric Company

121 S. W. Salmon Street

Portland, Oregon 97204

Attention:

Mr. Charles Goodwin, Jr.

Assistant Vice President

Gentlemen:

Subject:

NRC Inspection of the Trojan fluclear Plant

This refers to the inspection conducted by Mr. M. H. Malmros of this

office on March 1-30, 1979 of activities authorized by flRC License flo.

flPF-1, and to the discussion of our findings held by Mr. Malmros with

Messrs. B. Withers, F. Lamoureaux and other members of your staff

periodically during the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, in-

terviews with personnel, and observations by the inspector.

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full compliance with fiRC requirements,

as set forth in the flotic.e of Violation, enclosed herewith as Appendix A.

These items of noacompliance have been categorized into a level as de-

scribed in our correspondence to all flRC licensees dated December 31,

.-

1974.

The information in Appendix A relates to your physical security

'

program, and therefore, is exempt from public disclosure pursuant to

Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code

of Federal Regulations.

Accordingly, Appendix A will not be placed in

the Public Document Room.

l

'

This notice is sent to you pursuant to the provisions of Section 2.201,

of the f1RC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations.

Section 2.201 requires you to submit to this office,

"

GS0lb

7908000 6

.

. r.' : 2

-

.

.

.

APR E3 M

Portland General Electric Company

-2-

.

within twenty (20) days of your receipt of this notice, a written state-

-

ment or explanation in reply including (1) corrective steps which have

9

been taken by you and the results achieved; (2) corrective steps which

will be taken to avoid further violations; and (3) the date when full

compliance will be achieved.

Your response should be prepared so that

g

information which relates to your physical security program is included

'

4

in a separate enclosure since this information will not be placed in

,

the Public Document Room.

J"

In accordance with Section 2.790 of the f1RC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the 11RC's Public

Document Room.

If this report contains any information that you believe

to be proprietary, it is necessary that you submit a written application

to this office, within 20 days of the date of this letter, requesting

that such information be withheld from public disclosure.

The application

must include a full statement of the reasons why it is claimed that the

information is proprietary.

The application should be prepared so that

any proprietary information identified is contained in an enclosure to

the application, since the application without the enclosure will also

be placed in the Public Document Room.

If we do not hear from you in

this regard within the specified period, the report will be placed in

the Public Document Room.

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Sincerely,

/ -

,

/

/

b([ h

(p

. L. Crebs,jy

Chief

eactor Operations and

fluclear Support Branch

Enclosures:

m

A.

flotice of Violation

)

B.

IE Inspection Report

tio. 50-344/79-07

ao

cc w/o enclosure

b

B. Withers, PGE

l

F. Gaidos, PGE

,

L

E0210

'

.-

3 N.