ML19242B988
| ML19242B988 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 08/03/1979 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Davidson D CLEVELAND ELECTRIC ILLUMINATING CO. |
| References | |
| NUDOCS 7908090628 | |
| Download: ML19242B988 (1) | |
Text
yf o,
UNITE D STATES TC y,,"g,_,#cf( 'g NUCLEAR REGULATORY COMMISSION g.f c
REGION lli o,
gg
[
799 ROOSEVELT ROAD f
\\
.be o
GLEN E LLYN, ILLINOIS 60137 AUG 3 1979 Docket No. 50-440 Docket No. 50-441 The Cleveland Electric Illuminating Company ATTN:
Dalwyn R. Davidson Vice President-Engineering P. O. Box 5000 Cleveland, OH 44101 Gentlemen:
Thank you for your interim report dated July 25, 1979, pursuant to 10 CFR 50.55(e) regarding inadequate compaction of Class "A" backfill and settling el individual pipes of P45 system. We will review your final report on this matter upon receipt.
Your cooperation with us is appreciated.
Sincerely, G. Fiore11i, Chief Reactor Construction and Engineering Support Branch cc: Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Harold W. Kohn, Ohio Power Siting Commission M. Daniel D. Wilt, Atto.acy W
)b' w sJ is a jit 7 90809 0 C,J2E