t Florida Power
- HV >HAf4 \\
August 6, 1979 File:
3-0-3 -a -3 Mr. Robe rt W.
Re id Chief Operating Reactors Branch #4 Division of Operating Reactors U.S. Nuclear Regulatory Commission Washington, D. C. 20555 Sub je ct :
Crystal River - Unit #3 Docket No. 50-302 Ope rat ing License No. DPR-72
Dear Mr. Reid:
In a discussion with !!r.
M.
Fairchild of your staf f on August 3, 1979, Florida Power Corporation received concurrence f or the f ollowing course of action.
During the post-ref ueling startup testing of the Auxiliary Feedwater System at Crystal Piver Unit 3, the ultrasonic flow indicator t ransducers malf unctioned due to the use of Ibin Feedwater during a portion of the test.
The thin Feedwater used was at a temperature above t he temperature rating of the transducers ; theref ore, the t ransduce rs malf unct ioned.
The transducers we re immediately replaced with comparable equipment that was readily available.
High temperature rated transducers were ordered on July 30, 1979, with an anticipated delivery time of two to f our weeks.
Upon receipt, these high t e mpe ra t ure transducers will be installed.
The following steps ensure that Auxiliary Feedwater flow is assured when required: 1) the startup test has been completed that compromised the transducers and will not be repeated prior to installation of the high temperature rated transducers; and 2) a short term instruction has been issued that, upon loss of Auxiliary Feedwater flow indication when it is required, a dedicated operator (Chief Nuclear Operator) will continuously verify Auxiliary Feedwater flow using available alternate instrumentation until Auxiliary Feedwater flow indication is res to red or t he reactor is subcritical.
7 908090 vs7 589 I6 General Office 3201 in.ny founn sneet soo:n. P O Bon 14042. St Pete'sbu g F'onJa 33733 e 613 6 % 5151 r
If r. Robe rt W.
Re id Page 2 August 6, 1979 Therefore, until such ti; tie high tempe rature rated transducers are installed, ower Corporation feels that ope rat ion of Crystal River Unit 3 is not compromised.
Very truly yours, FLORIDA POWER CORPORATION
'W W.
P.
St e wa rt Manager, Nuclea r Operations WPSe mhM02 D70 cc:
Mr. J.
P.
O'Reilly U. S.
Nuclear Regulatory Commission Office of Inspection and Enf orcement Suite 3100 101 Marietta St reet Atlanta, CA 30303 3 't 6
\\ ;V g r) f?I JU
STATE OF FLORIDA COUNTY OF PINELLAS W.
P.
Ste wa rt states that he is the Ibnager, Nuclear Operations,
of Florida Power Corporation ; that he is authorized on the part of said company to sign and file with the Nuclear Regulatory Commis s ion t he information attached hereto; and that all such s ta t e men t s made and entters set forth therein are true and correct to t he be st of his knowledge, information and belief.
\\
.1 rAA.1h
)
-~.P.
Stewart W
Subscribed and sworn to bef ore me, a Notary Public in and for the State and County above named, this 6th day of August, 1979.
n.
C Notary Public Notary Public, State of Florida at Large, tiy Commission Expires : August 24, 1983 sw{