Text
'
11C)
-
km a8Gg%
UNITED STATES
,,/
i
i,
NUCLEAR REGULATORY COMMISSION
,
fid7
i E
REGION lil
5
'
f
D
4
GLEN ELLVN ILLINOIS 50137
I
'%
/
JUN 191979
Docket No. 50-295
Docket No. 50-304
Commonwealth Edison Company
ATTN:
Mr. Byron Lee, Jr.
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the inspection conducted by Dr. M. J. Oest, nn,
Messrs. W. L. Axelson, J. W. Hiatt and J. E. Kohler of thi<. office
on June 1, 1979, of activities at the Zion Nuclear Power Station,
Units 1 and 2, authorized by NRC Operating Licenses No. DPR-39 and
No. DPR-48 and to the discussion of our findings with Mr. N. Wandke
and other members of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined
during tue inspection. Within these areas, the inspection consisted
of a selective examination of procedures and representative records,
observations, and interviews with personnel.
No iten.s of noncompliance with N3C requirements were identified
during the course of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter
and the enclosed inspection report will be placed in the NRC's
Public Document Room, except as follcws.
If this report contains
information that you or your contractors believe to be proprietary,
you must apply in writing to this office, within twenty days of your
receipt of this letter, to withhold such information from public
disclosure. The application must include a full statement of the
reasons for which the informati-
is considered proprietary, and
should be prepared so that proprietary information identified in the
application is contained in an enclosure to the application.
c .
-
.
J2/.
j44
79 08 08 o (h 23'()
'
,
.
Commonwealth Edison
-2-
JUN 191979
Company
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
A. B. Davis, Chief
Fuel Facilit.y and
Materials Safety Branch
Enclosure:
IE Inspection
Reports No. 50-295/79-09
and No. 50-304/79-10
cc w/ encl:
Mr. N. Wandke, Plant
Superintendent
Central Files
Reproduction Unit NRC 20b
Local PDR
Mr. Dean Hansell, Ofiice of
Assistant Attorney General
527