Cevc ' Y ca :19 '225 ram macc July 25, 1979 EF2-50,107 Mr. James G. Keppler Regional Director Directorate of Regulatory Operations Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Subj ect:
10CFR50.55(e) Deficiency Report on Handling Damage to Core Spray Pump Motor
References:
(a) Reporting of Potential 10CFR50.55(e) Deficiency to Mr. H. S. Phillips on February 23, 1979 (b) Interim Status Report EF2-46,125 dated March 22, 1979
Dear Mr. Keppler:
Pursuant to the provisions of 10CFR50.55(e) (3), this interim report is being filed as an official follow-up to reference (a) concerning han ling damage to the Core Spray Pump Motor identified as E21-01-C001-D.
The motor was sent to General Electric Company's Manufacturing Division, San Jose, California.
Disassembly and inspection have been performed.
Edison Engineering, in conjunction with General Electric representatives, are presently evaluating the extent of damage and determining the neces-sary repairs.
A final report will be issued if the resulting damage is considcred signi'icant enough to be classified as a reportable deficiency.
If we determine it not to be reportable under 50.55(e), we will notify your office.
Sincerely yours, ff h0-
'^
W. J. Fahrner Project Manager Enrico Fermi 11 cc:
Mr. John C. Davis Acting Director Office of Inspection and Enforcement 4