ML19242B267
| ML19242B267 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 07/13/1979 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Hines E DETROIT EDISON CO. |
| References | |
| NUDOCS 7908070796 | |
| Download: ML19242B267 (1) | |
Text
.-
PO;;
- g * **G<in'o UNITED STATES
!],y,(f(
NUCLEAR REGULATORY COMMISSION REGION lit
,g *i/i c
o, gM j
799 ROOSEVELT ROAo
- g ' \\/
e
GLEN ELLYN, ILLINOIS 60137 JUL 131979 Docket Nn.10-341 The Detroit Edison Company ATTN:
Mr. Edward Hines, Assistant
~
Vice President and Manager Quality Assurance 2000 Second Avenue Detroit, MI 48226 Gentlet.2n:
Rt: cent events occurring at sites under construction have generated c x2siderable interest by Members of Congress and the Cot =nission.
.,e must continue to be responsive to these groups and must have complete and correct information on a timely basis of significant events which occur at your site.
We request that you include, when reporting information on events of interest to this office, any major acts of vandalism, demonstrations to be he3.1, bomb threats or other threats as they are received.
We emphasize that this information will not be disseminated is the type of information we need to indiscriminately, but 4'
know to be in a bette position to assess and respond.
Your cooperation in this matter is appreciated.
Sincerely, C%
u b f'p % d.k n u
gJamesG.Ke Director cc:
Central Files Reproduction Unit NRC 20b PDR Local PDR MSIC TIC Ronald Callen, Michigan Public Service Cc ission Eugene B. Thomas, Attorney JO/
D
~
29080707 7$