ML19242A877

From kanterella
Jump to navigation Jump to search
Forwards LER 79-048/03L-0
Date released: 09/13/2019 Download: ML19242A877


LER 79-048/03L-0 on 790713:during High Streamline Functional Test,Monitor B Was Found Out of Calibr.Caused by Instrument Drift.Instrument Recalibr & Returned to Svc
ML19242A878
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 08/02/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19242A878 (1)
Forwards LER 79-048/03L-0
ML19242A876
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 08/02/1979
From: Banks H
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19242A876 (1)