ML19242A687
| ML19242A687 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 06/19/1979 |
| From: | Foirelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Howell S CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| References | |
| NUDOCS 7908030414 | |
| Download: ML19242A687 (1) | |
Text
l' pm "Ec oq'O, g
UNITED STATES
+
NUCLEAR REGULATORY COMMISSION f))P S
REGION 118 In
E GLEN ELLYN, ILLINOIS 60137
/
JUN 191979 Docket No. 50-329 Docket No. 50-330 Consumers Power Company ATTN:
Mr. Stephen H. Howell Vice President 1945 West Parnall Road Jackson, MI 49201 Gentlemen:
Thank you for your interim report dated June 8, 1979, pursuant to 10 CFR 50.55(e) regarding pressurizer heater system.
We will revieu your final report on this matter upon receipt.
Your cooperation with us is appreciated.
Sincerely,
'0SL G. Fiorelli, Chief Reactor Construction and Engineering Support Branch cc:
Central Files Reproduction Unit hTC 20b PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Dr. Wayne E. North Myron M. Cherry, Chicago P
468 223 -
19 0803 0 F/'