ML19242A508

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-416/79-09 & 50-417/79-09 on 790502-04.No Noncompliance Noted
ML19242A508
Person / Time
Site: Grand Gulf  
Issue date: 05/18/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML19242A505 List:
References
NUDOCS 7908020539
Download: ML19242A508 (2)


See also: IR 05000416/1979009

Text

-

.

UNITED STATES

  1. g #80og\\

,

NUCLEAR REGULATORY COMMsSSION

~

8

REGION ll

9

,ec

$

101 M AN:UT A ST R E E T. N.W.

3

-

[

ATLAN7A. C10RGI A 303o3

I

"'% * * * * * #

MAY I 81979

In Reply Refer To:

RII:JKR

50-416/79-09

50-417/79-09

Mississippi Power and Light Company

Atta:

N. L. Sta pley

Vice President of Production

Post Office Box 1640

Jackson, Mississippi 39205

Gentlemen:

This refers to the inspection conducted by J. K. Rausch of this office

on May 2-4, 1979 of activities authorized by NRC Construction Permit

Nos. CPPR-ll8 and CPPR-119 for the Grand Gulf Nuclear Powar Plant facility,

Units 1 and 2, atol to the discussion of our findings held with I

W. Sly

at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective exciinations of procedures and representative

records , interviews with

ersonnel, and observations by the inspector.

Within the scope of this .nspection, no items of noncompliance were

disclosed.

We have examined actions you have taken with regard to previously identi-

fied enforcement matters and unresolved items.

The status of these

items is discussed in the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulatioec, a copy of this letter and

the enclosed inspection repor; will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure.

Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

P'n

,

4Ud

dr

/

_

79080E05]p

,

.

,

Mississippi Power and

-2-

Light Company

Should you have any questicas concerning this letter, we will be glad to

discuss them with you.

Sincerely,

p

.

/

-

Charle: E. Murphy, Chief

Reactor Construction and

'

Engineerning Support Branch

Enclosures-

Inspection Report Nos. 50-416/79-09

and 50-417/79-09

cc w/ enclosures:

C. K. McCoy

Plant Manager

Post Office Box 756

Port Gibson, Mississippi 39150

460

000