ML19242A217
| ML19242A217 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 07/06/1979 |
| From: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Cavanaugh W ARKANSAS POWER & LIGHT CO. |
| References | |
| NUDOCS 7907310619 | |
| Download: ML19242A217 (1) | |
Text
. /*
- CENT AL FILES o
UNITED STATES
- k
[ p,,f' 7; NUCLEAR REGULATORY COMMISS;ON a c sypy[
j REGION IV g
C, 'c fg.,;;,4 g
611 RYAN PL AZA ORIVE, SulTE 1000 q' g 7 g
%, 'bd9 [
ARLl? oTON, TEXAS 76012 July 6, 1979 Docket Nos.
50-313 50-368 Arkansas Power and Light Cocpany ATTN:
Mr. Willia = Cavanaugh III Vice President of Generation and Construction P. O. Box 551 Little Rock, Arkansas 72203 Gentlemen:
This IE Infor:ation Notice is provided as an early notification of a possibly significant matter.
It is expected that recipients will review the information for possible applicability to their facilities.
No specific action or response is requested at this time.
If you have questions regarding this catter, please contact the Director of the appropriate NRC Regional Office.
i
~
k,V n.. :
g
' r1 V. Seyfric Director
Enclosures:
1.
IE Information Notice No. 79-18 2.
List of IE Infor=ation Notice Issued in 1979 cc:
James P. O'Hanica, Plant Manager Arkansas Nuclear Cne P. O. Box 603 Russellville, Arkansas 72801 L. Alexander, QC Supervisor
,i
~~
(1 0
7907310(3 l#[
UNITED STATES NUCLEAR REGUL\\ TORY COD!ISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 IE Information Notice No. 79-13 Date-July 6, 1979 Page 1 of 1 SKYLA3 REENTRY Description of Circumstances:
The most recent dates for reentry of Skylab are July 10 to 14, 1979, with July 12, as the most probable date. Recognizing that a bit on a nuclear reactor would be highly unlikely by Sky? ab debris, the NRC believes it would be prudent for licensees to review their contingency plans in case such an event should actually occur.
The NRC is in communication with the Department of Energy (DOE), and will receive notification from them as soon as the reentry corridor can be established.
This notification cay occur within 1 to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> before reentry actually occurs.
If it is determined that there are any licensed nuclear power plants in the reentry corridor, the plants will receice notification from their respective Regional Office via the dedicated phone line.
This Information Notice is provided as an early notification of a possibly signif. cant nr.tter.
It is expected tuat recipients will review the.informa-tion for possible applicability to their facilities.
No specific action or response is requesced at this time.
If further NRC evaluations so indicate, an IE Circular or Bulletin will be issued to reccmaend or request specific licnesee acti:ns.
If you have questions regarding the matter, please contact the Director of the apprcpriate NRC Regional Of fice.
No writteu response to this infarcatica notice is tequired.
7907]20387
(
[
h*=
-em y
a
+
we e +
,m=*
.,,f..
^
- -. -.. x..
- m. ;,. -,,,,,,
- s.,,,,,,,,,.,,,....
...........,.c..
4*~.f.l[.?
- 3. ;. g.. ;,
..s....
IE information Notice No. 79-1S r..
July 6, 1979 LISTING OF IE INFOR"ATION NOTICES 3:
ISSUED IN 1979 Information Subject Date Issued To 1,
Notice ho.
Issued 79-01 Br.rgen-Paterson Hydraulic 2/2/79 All power reactor i
Shock and Sway Arrestor facilities with an Operatiug License
!.. ?
(OL) or 1 Construc-
~
tion Permit (CP)
J-79-02 Attempted Extortton -
2/2/79 All Fuel Facilities
.j Low Enriched Urinica 79-03 Limitorque Val /e Geared 2/9/79 All power reactor Limit Switch Iubricant facilities with an Operating License (OL) or a Construc-
- .4 tion Permit (CP)
~
'{
79-04 Degradation
- Engineered 2/16/79 All power reactor i'
Safety Fe.;u ms facilities with an
~ ~
Operating License l'
(OL) or a Construc-tiori Permit (CP)
Ji
'~
79-05 Use of I= proper Materials 3/21/79 All power reactor 2,,
In Safety-Related Components facilities with an Operating License
L'
. s, 4
73-06 Stress Ana:jsis cf 3/23/79 All Holders of an
-T Sa fety-Relatcl Fipia; Reactor C erating T
E.'
License (OL) or a i-Construction Permit (CP)
)
/9-07 Rupture of 'adwaste 3/26/79 All power raactar l'
Tanks facilities with an I. ~
Operating License T
(OL) or a Construc-tica Permit (CP)
Enclosure o
Page 1 of 2 E:
f D,
.. t s'.-
.e
~.,
b
.f..
.* i,:
- l u;..,
fg 8,
g I
g i.
-.'a..
9;'-
ca
1 1 IE Information Notice No. 79-18 July 6, 1979 79-08 Interconnection of 3/28/79 All power reactor Contaminated Systems with facilities with an Service Air Systems Used Operating License As the Source of Breathing (OL) and Pu Proces-Air sing fuel facilities 79-09 Spill of Radioactively 3/30/79 All pcwer reactor Contaminated Resia facilities with an Operating License (OL) 79-10 Nonconforming Pipe 4/16/79 All power reactor Support Struts facilities with a Construction Pe rmit (CP) 79-11 Lower Reactor Vessel Head 5/7/79 All Holders of Reactor Insulation Support Problem Operating Licenses (0Ls)
Construction P raits (cps) 79-12 Attempted Damage to Nr
- /11/79 All fuel facilities, Fuel Assemblies research reactors, and power reactors with an Operating Licensee (CL) or a Construction Permit (CP) 79-13 Indication of Low Water 5/29/79 All Holders of Operating Level in the Dyster Creek License (OL) or Reactor Construction Permit (CP) 79-14 NRC Position of Electrical 6/11/79 ill Pcwer Reactor Cable Support Systems facilities with a Constructica Permit (CP) and applicants 79-15 Deficient Procedures 6/7/79 All Halders of Reactor Operating Licenses (OLs) and Construction Permits (cps) 79-16 Nuclear Incident at Three 6/22/79 All Research Reactors Mile island and Test Reactors with Operating Licenses (OLs) 79-17 Scurce Holder Assembly 6/20/79 All Holders of Reactor Damage Frca Misfit 3etween Operating Licenses (OLs)
Assembly and Reactor Upper and Construction Grid Plate Pe rmits (cps)
Enclosure Page 2 cf 2
^
./ ' f.
o r