Text
a Et c ,o
u
UNITED STATES
y
'g
NUCLEAR REGULATORY COMMISSION
y ;
"y,
g
ti '
c. C
REGION IV
3, 2
611 RYAN PLAZA DRIVE, SulTE 1000
%, ' V
,o'
+ ..+
June 18, 1979
In Reply Refer To:
RIV
Docket Nos.
50-498/Rpt. 79-07
50-499/Rpt. 79-07
Houston Lighting and Power Company
Attn:
Mr. E. A. Turner, Vice President
Power Plant Construction
and Technical Services
Post Office Box 1700
Houston, Texas
77001
Gentlemen:
This refers to the inspection conducted by Mr. R. J. Everett during the period
May 7-9, 1979, of activities authorized by NRC Construction Permit Nos.
CPPR-128
and 129 for the South Texas Project, Units No. I and 2, and to the discussion
of the findings with Mr. D. R. Betterton and other members of your staff at
the conclusion of the inspection.
Areas examined during' the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of the inspection, no items of noncompliance were identified.
Two new unresolved items are identified in paragraphs 6 and 8 of the enclosed
report.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of Qis letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If t.he
report contains any information that you believe to be proprietary, it is
necessary that you submit a w.-itten application to this office, within 20 days
of the date of this letter, requesting that such information be withheld from
public disclosure. The application must incit.de a full statement of the reasons
why it is claimed that the information is proprietary.
The application should
be prepared so that any proprietary information identified is contained in an
enclosure to the application, since the app'.1 cation without the enclosure
will also be placed in the Public Documer.c Room.
If we do not hear from you
in this regard within the specified period, the report will be placed in the
Public Document Room.
567
odd
go
.
.
Ilouston Li hting and Power Company
-2-
June 18,1979
d
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
'
.
- %
'
-
W. C. Sei le Chief
Reactor Co
truction and
Engineering Support Branch
Enclosures:
IE Inspection Report Nos.
50-498/79-07
50-499/79-07
..
(/