Forwards Safety Evaluation Re Util Reanalysis of ECCS Performance.Requirements Fulfilled Re 780428 Order for Mod of License
ML19242A129
Person / Time
Site: Point Beach  
Issue date: 06/04/1979
From: Schwencer A
Office of Nuclear Reactor Regulation
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML19242A130 List:
References
NUDOCS 7907310329
Download: ML19242A129 (3)


Text

-

ii[N

. >* a r c UNITED STATES g.

f,,

NUCLEAR REGULATORY COMMISSION y'x s, g

C WASHINGTON, D. C. 20555

g

?. '

c June 4, 1979 Docket Nos. 50-266 and 50-301 Mr. Sol Burstein Executive Vice President Wisconsin Electric Power Company 231 West Michigan Street Milwaukee, Wisconsin 53201 Cear Mr. Burstein:

This refers to your letter of March 20, 1979, wherein you submitted a revised ECCS analysis for Point Beach Nuclear Plant, Unit Nos. I and 2, in compliance with our Order for Modification of I.icense dated April 28, 1978. The Order was issued as a result of the discovery of an error in the zirconium-water reaction model in the computer codes used in the loss-of-coolant analysis for Point Beach Units and other plants.

he have completed our review of your reanalysis of ECCS performance.

~

A copy of our Safety Evaluation Report is enclosed.

The reanalysis r

was performed with the approved February 1978 version of the Westinghouse Evaluation Model in which the error has been corrected.

The reanalysis assumed that 10% of steam generator tubes were plugged, and used a total peaking factor of 2.32.

Based on our review, we conclude that you have fulfilled the requirements of our Order for Modification of License of April 28, 1978.

Accordingly, that Order is hereby terminated.

Sincerely, 1

A. Schwencer, Chief Operating Reactors Branch #1 Division of 0~perating Reactors

Enclosure:

Safety Evaluation Report cc: w/ enclosure See next page N

\\

p, 79073To 3Rp

._ / )

v

Mr. Sol Burstein Wisconsin Electric rower Cempany June 4, 1979 cc:

Mr. Bruce Churchill, F quire Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.

Washington, D. C.

20036 Document Department University of Wisconsin Stevens Point Library Stevens Point, Wisconsin 54481 Mr. Glen Reed, 'lanager Nuclear Poser Division Point Beacn Nuciear Plant Wisconsin Ele.ric Power Company Route 3, P. O. Box 48 Two Rivers, 'di sconsin 54244

~

't ',

' :U e

1 L; i.,8.

E a References 1.

Letter from Wisconsin Electric Power Company (S. Burnstein) to NRC (fi. R. Denton), dated March 20, 1979, transmitting:

LOCA Reanalysis, Point Beach Nuclear Plant, Units 1 and 2.

2.

Letter from NRC ( A. Schwencer) to Wisconsin Electric Power Company (S. Burnstein), dated April 28, 1979, transmitting Order for Modification

)f License for Point Beach Nuclear Plant, Units 1 and 2.

Letter from Westinghouse Electric Corporation NS-CC-175' (C. Eicheldinger) 3.

to NRC (J. F. Stolz), dated April 7,1978, transmitting LOCA-ECCS Analysis with Zr/ Water Reaction Correction.

4 WCAP-9220-P-A, Westinghouse ECCS Eva uation Model, February 1978 Version.

February 1978.

5.

Letter from NPC ( A. Schwencer) to Wisconsin Electric Power Company (S. Burnstein), dated April 28, 1978, transmitting Order for Modification of License for Point Beach Nuclear Plant, Units 1 and 2.

6.

U.S. Nuclear Regulatory Commission, " Safety Evaluation Report on Interim ECC5 Evaluation Model for Westinghouse Two-Loop Plants," March 19}8.

Tf{

g()4

-