Text
ofa ascg
b
[
'o,
UNITED STATES
8 -lg , . . g %
NUCLEAR REGULATORY COMMi3SION
g:# [3
2
HEGION IV
,
Qh
G11 RY AN PL AZA DHIVE, SUITE 1000
SM\\ +..../
_
ARLINGTON. TE XAS 76012
'
In Rcply Refer To:
~
RIV
Docket No. 50-498/Rpt. 79-09
50-499/Rpt. 79-09
Houston Lighting and Power Company
ATIN:
Mr. E. A. Turner, Vice President
Power Plant Construction an<.
~
Technical Services
Post Ofrice Box 1700
Houston, Texas
77001
Gentlemen:
This refers to the investigation conducted by Mr. W. G. Hubacek and other
members of our staf f during the period thy 15-18 and 22-23,1979, of activities
authorized by NRC Construction Permit Nos. CPPR-128 and 129 for the South Texas
Project facility, Units No. 1 and 2, concerning an allegation by a former South
Texas Proj ect employee.
The investigation and our findings are discussed in the enclosed investi:2 tion
report.
Within the scope of the investigation, no items of noncompliance were identified.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed investi-
gation report will be placed in the NRC's Public Document Room.
If the report
contains any information that you believe to be proprietary, it is necessary
that you submit a written application to this office, within 20 days of the
date of this letter, requesting that such inf ormation be withheld f rom publi-
disclosure.
The application must include a full statement of the reasons why
it is claimed that the inf ormatioa is proprietary.
The application should be
prepared so that any proprietary information identified is contained in an
enclosu-e to the application, since the application without the enclosure will
a l .u oe placed in the Pu'lic Document Room.
If we do not hear from you in this
o
regard within the specified period, the report will be placed in the Public
Document Room.
/< u( J
7
7
JvJ
7 0 0 73 9 9 g;5,
4
.
Ilouston Lighting and Power (smpany
-2-
June 8, 1979
, . -
Should you have any questions concerning this investigation, we will be pleased.to
discuss them with you.
Since re 1., ,
/c
W. C. Sei
e, Chief
Reactor Construction and
-
I.ngineering Support Branch
Enclosure:
IE Inspection Report No. 50-498/79-09