ML19241C072
| ML19241C072 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 06/08/1979 |
| From: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML19241C073 | List: |
| References | |
| NUDOCS 7907260559 | |
| Download: ML19241C072 (2) | |
See also: IR 05000445/1979009
Text
pa arcg'o
UNITED STATES
e
S
[,.. ,
NUCLEAR REGULATORY COMMISSION
%
e
REGION IV
- , $q
- .j'gh[u.
o, h
[
611 RYAN PLAZA DRIVE, SUlYE 1000
,
r
% .' .s [
J
...
June 8, 19 79
In Reply Refer To:
RIV
Docket No. 50-445/Rpt. 79-09
50-446/Rpt. 79-09
Texas Utilities Cenerating Company
ATTN:
Mr. R. J. Garv, Executive Vice
President and General Manager
2001 Bryan Tower
Dallas, Texas
75201
Gentlemen:
This refers to the investigatio1 conducted by Mr. R. C. Stewart and other tembcrs
of our staff during the period April 5,1979, through Iby 7,1970, of activities
authorized by NR ' Construction Pe
ts No. CPF2-126 and 127 for the Comanche
Peak facility, Units No. 1 and 2, . acerning allegations by former Cocanche Peak
employees which appeared in news nrticles of the Fort Worth Star-Telegraa on
April 4, 5, 6 and 8, 1979.
The investigation and-our findings are discussed in the enclosed investigation
report.
Within the scope of the investigation, no items of noncompliance were identified.
Even though no itecs of noncompliance with NRC requirements were detected during
this investigation, it was not possible to either substantiate or refute several
of the allegati,ns. We would appreciate an opportunity to discuss the results
of the investigat ion in our office af ter you have had an oppertunity to review
the report.
The reason for this discussion stens from our desire to obtain yotr
reaction en the wide range of natters covered in this investigation.
In accordance with Section 2.790 of the NRC's " Rules cf Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed investi-
gation report will be placed in the NRC's Public Document Room.
If the report
contains any information that you believe to be proprietary, it is necessary
that you submit a written application to this office, within 20 days of the
date of this letter, requesting that such information be withheld frou public
disclosure.
The application must include a full statement of the reasons why
it is claimed that the inforcation is proprietary. The application should be
.
'j
-
1r D 0720 o {j71
467
n?7
s
Texas Utilities Generating Company
-2-
June 8,19 79
prepared so that any proprietary information identified is contained in an
enclosure to the application, since the application without the enclosure will
also be placed in the Public Document Room.
If we do not hear from you in this
regard within the specified period, the report will be placed n the Public
Document Room.
Should you have any questions concerning this investigation, we will be pleased
to discuss them with you.
Sincerely,
/?
ff)
_
W. C. Seid
, Chief
Reactor Construction and
Engineering Suppart Branch
Enclo.eure :
IE Investigation Report No. 50-445/79-09
50 446/79-09
cc: w/enclosur e
,,
Texas Utilities Generating Company
ATTN:
Mr. H. C. Schmidt, 'roject Manager
2001 Bryan Tc wer
Dallas, Texas
75291
.I
467
028