Forwards IE Insp Repts 50-373/79-18 & 50-374/79-12 on 790515-16.No Noncompliance Noted
ML19241B889
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 06/05/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML19241B890 List:
References
NUDOCS 7907250290
Download: ML19241B889 (2)


See also: IR 05000373/1979018

Text

TIC

,

gma meg

UNI T E D STATES

f.

,

NUCLE AR REGULATORY COMMISSION

,,

[

ti

R E GION 111

o

E

.

f

799 ROOSE VE LT GOAD

E

e

cLE N E U YN. 4L UNOl5 60137

g,

--

,#

  • ....

JUN 5

1979

Docket No. 50-373

Docket No. 50-374

Commonwealth Edison Company

ATTN:

Mr. Byron Lee, Jr.

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to t.e inspection conducted by Mr. J. II. Neisler of this

office on May 15 16, 1979, of activities at La Salle County Station,

Unit 1 & 2, authorized by NRC Construction Permit No. CPPR-99 and

No. CPPR-100 and to the discussion of our findings with Mr. R. T. Rose

and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection.

Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

No items of noncon liance with NRC requirements were identified

during the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations,

a copy of this letter

and the enclosed inspection report will be placed in the NRC's

Public Document Room, except as follows.

If this report contains

information that you or your contractors believe to be proprietary,

you must apply in writing to this office, within twenty days of your

receipt of this letter, to withhold such information from public

disclosure. The application must include a full statement of the

reasons for which the information is considered proprietary, and

should be prepared so that proprietary information identified in the

application is contained in an enclosure to the application.

- i .

'

(j'

r

M

q90

.

Commonwealth Edison

~

- 2-

JUN 5

1979

Company

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

7 tid

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection

Reports No. 50-373/79-18 and

N-

50-374/79-12

cc w/ encl:

Mr. L. J. Burke, Site Project

Superintendent

Mr. T. E. Quaka, QA

Supervisor

Mr. R. H. Holyoak, Station

Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Mr. Dean Hansell, Office of

Assistant Attorney General

_ . , . ,

I

) iu