ML19241B467

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 78-12,12A & 12B.Reactor Vessel Mfg for WNP-3/5 Requested to Perform Records Search.Mfg Plans to Submit Generic Rept Covering All Reactor Vessels by C-E. Vendor Certifies Applicability of Rept
ML19241B467
Person / Time
Site: Satsop
Issue date: 05/25/1979
From: Renberger D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
GO9977, NUDOCS 7907180076
Download: ML19241B467 (1)


Text

-

3' E

O c-_ -

2

{C Washington Public Power Supply System A JOINT OPERATING AGENCY 3'

P. O. Do x 9 6 0 3000 G e o. Was:liNcrom W AY RIC.HL AN D, W A SHINGroN 99352 PHON E (509) 3 7 5-5000 May 25,1979 Docket flos. 50-508 and 50-509 G09977

/p, f

Mr. R. H. Engelken, Director

)

1 U.S. Nuclear Regulatory Commission

,3 41 Region V j/

Suite 202, Walnut Creek Plaza 1990 N. California Boulevard Walnut Creek, CA 94596

Subject:

WPPSS NUCLEAR PROJECTS f105. 3 AND 5 RESPONSE TO IE BULLETIN 78-12.78-12A AND 78-12B,

Reference:

Letter, R. H. Engelken to N. O. Strand, Same Subject, September 29, 1978, November 24, 1978 and March 19, 1979.

Dear Mr. Engelken:

In response to the subject lE Bulletins, UPPSS has requested our reactor vessel manufacturer for WNP-3/5, Combustion Engineering, Inc.,

to perform a records search as requested by the subject Bulletins.

CE has informed us that they plan to submit a generic report to the NRC covering all reactor vessels manufactured by CE.

CE will also certify to us the applicability of the report to the reactor vessels for the WNP-3/5 plants.

We will reference the generic report in our final response to the Bulletins.

The generic report will be submitted to the NRC by CE on or before August 13, 1979.

Should you have any questions with regard to our response, please contact me.

Very truly yours, Wl D. L. RENBERGER Assistant Director-Technology 519 048 0 76 7907180 Q Q

p qg