ML19241B392

From kanterella
Jump to navigation Jump to search
Forwards LER 79-040/03L-0
Date released: 09/12/2019 Download: ML19241B392


LER 79-040/03L-0 on 790614:chloride Intrusion Monitor 2-CO-CR24 Point 4 Would Not Calibr at High End of Scale. Caused by Defective Conductivity Cell.Cell Replaced,Monitor Tested & Returned to Svc
ML19241B394
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 07/12/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19241B394 (1)
Forwards LER 79-040/03L-0
ML19241B391
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 07/12/1979
From: Banks H
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19241B391 (1)