ps Ho UNITED STATES
'^
NUCLEAR REGULATORY COMMISSION
[
g g
naciou n tg-5 r
9, g ATuurA.ceoncia sesas 5
%,..W... p SSINS MEh0RANDLH FOR:
K. W. Whitt, Chief, Performance Appraisal Branch, IE:EQ DOM:
R. C. Lewis, Acting Chief, Reactor Operations and Nuclear Support Branch SU3 JECT:
REGION 11 COMMENTS ON CRYSTAL RIVER RESPONSE To lEB 79-05 AND 79-05A Coc:::ents are keyed to the numbered response in Florida Power Conoration-response dated April 9,1979.
Item 1
~
Coment (1)
The response to the concern of a stuck open electronatic relief valve refers to the small break LOCA analysis. Whils this is accurate, the response should be addressed to a loss of feed flow transient, not to a small-break.
Item 3 The licensee should provide curve of pressure-teeperature relationships a
for voiding concerns to the operators in the control room.
Item 4(a)
Response is not clear as to how ESFAS will be teminated. That is, will the signal be " bypassed" or " reset".
" Reset" being the preferred nethod since " bypass" precludes further automatic action.
Item 5 Cocoent (1)
Response does not address the positions of emergency feed pump suction valve, EEV3 and EFV4 and manual suction valve EFV-36 (reference Fig. 10-2A in FSAR).
All of these valves should be open. Inspector has verified that these valves are kept open.
CONTACT:
D. Quick, Region II (404) 478-0509
-o99 udi wr0 E
Florida Power Corp.
R. Bright, (813) 823-5768 J. Colby, (813) 544-4280 B. Simpson, (305-595-7373)
,m
( s'] )
i 700716025T Ko/Jh 77-ff
K. W. Whitt d;
+j '
?
Cocment (2)
Response did not address position of CDV 103 (suction from condensate storage i
tank) and CDV 104 (emergency feed pump recirculation) (reference Fig.10-1 TSAR).
These valves are supposed to be locked open.
The inspector has verified checklist against P&ID's and actual valve positiona as belog correct -
as of April 13, 1979.
RII inspectors have verified that licensee actions indicated in these responses (items 1 through 3, 4.a and 5) have been implemented at Crystal River.
S. C.
R. C.
ewis, Acting Chief Reactor Operations and Nuclear Support Branch cc: