ML19241B370

From kanterella
Jump to navigation Jump to search
Comments on Licensee 790409 Response to IE Bulletins 79-05 & 05A
ML19241B370
Person / Time
Site: Crystal River, 05000303  Duke Energy icon.png
Issue date: 07/17/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Whitt K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
FOIA-79-98 NUDOCS 7907160253
Download: ML19241B370 (2)


Text

-.

ps Ho UNITED STATES

'^

NUCLEAR REGULATORY COMMISSION

[

g g

naciou n tg-5 r

101 MAA!ETTA sTR E ET, N.W.

9, g ATuurA.ceoncia sesas 5

%,..W... p SSINS MEh0RANDLH FOR:

K. W. Whitt, Chief, Performance Appraisal Branch, IE:EQ DOM:

R. C. Lewis, Acting Chief, Reactor Operations and Nuclear Support Branch SU3 JECT:

REGION 11 COMMENTS ON CRYSTAL RIVER RESPONSE To lEB 79-05 AND 79-05A Coc:::ents are keyed to the numbered response in Florida Power Conoration-response dated April 9,1979.

Item 1

~

Coment (1)

The response to the concern of a stuck open electronatic relief valve refers to the small break LOCA analysis. Whils this is accurate, the response should be addressed to a loss of feed flow transient, not to a small-break.

Item 3 The licensee should provide curve of pressure-teeperature relationships a

for voiding concerns to the operators in the control room.

Item 4(a)

Response is not clear as to how ESFAS will be teminated. That is, will the signal be " bypassed" or " reset".

" Reset" being the preferred nethod since " bypass" precludes further automatic action.

Item 5 Cocoent (1)

Response does not address the positions of emergency feed pump suction valve, EEV3 and EFV4 and manual suction valve EFV-36 (reference Fig. 10-2A in FSAR).

All of these valves should be open. Inspector has verified that these valves are kept open.

CONTACT:

D. Quick, Region II (404) 478-0509

-o99 udi wr0 E

Florida Power Corp.

R. Bright, (813) 823-5768 J. Colby, (813) 544-4280 B. Simpson, (305-595-7373)

,m

( s'] )

i 700716025T Ko/Jh 77-ff

K. W. Whitt d;

+j '

?

Cocment (2)

Response did not address position of CDV 103 (suction from condensate storage i

tank) and CDV 104 (emergency feed pump recirculation) (reference Fig.10-1 TSAR).

These valves are supposed to be locked open.

The inspector has verified checklist against P&ID's and actual valve positiona as belog correct -

as of April 13, 1979.

RII inspectors have verified that licensee actions indicated in these responses (items 1 through 3, 4.a and 5) have been implemented at Crystal River.

S. C.

R. C.

ewis, Acting Chief Reactor Operations and Nuclear Support Branch cc:

S. E. Bryan E. L. Jordan N. C. Moseley G D r.). s-e4 A

.