9 Ao. il 17,19/9 Ma40R.MIDtM TG:
S. C; Dryan, Assistant Diractor foh Fh.ld Coordine. tion THRU:
J. L. Crews, Chief, Reactor Operations an.1 Nuclear Support Branch FF,0M:
B... Faulkent.ry, Chief, Reactor ProjectsSection II SUdJECT:
RANCHO Sht.6 utsPGnk (6 It uuu.tTIH 79 05A In response to a telephone request from Roger Woodruff cn C/17/79.,
Rtgion V has reviewed Rancho Seco's April 16th respense to IE Bulletin (JEB)'/9-05A.
The results of this rcview are as follous:
- 1.
Ittm 4.a of IE3 79-05A was responded to in the Iicensee response dated April 11, 1979.
This re.pc.n.co a.idras ad the old nyuireitrat (4.a..79-05A) vs the new requircirent (/.a-79-06A).
Response to Item 4.b of IEB 79-05A is contained in the licensee's April 15,19/9 latter.
In this letter the licensee addressed the r.eu requirernent (7.b.-79-05A) vs 'the old requiren.ont (4.b-79-05A).
Hos:ever, on page 2 of the April 16th response the licensee states they are ravitin9 their proceduras to agrta with the requi.u.ents of 79-06A, Itemr. 7.a. and 7.b.
This is coasisvent with the Region V undct-standir.q of what is rcqu: tad and t:u site in3psctor W.'l Verif/ thtt the ptocedures and training instructions are changed to reflect these new requirements.
2.
Tiic licensee states that the combination of tboir respense to 192m 10 of IEB 70 0$A, as enutained in the ispril 1Gth letter, n d the rr.ponse to Itcm 5 of IEB 79-0511m as contained in the Ap.-il lith-latter,.is responsive to oil parts of Items 5 and 10 f r.cluding the last s ntence contained in Item 5 ci! IES79-05A.
t 3.
The licensee response to Itam 11 is not entiraiy corrcet.
As o.
sho 7 in our YI 2595/2 A.ily report (4/~s7/79) on Rancilo Seco there w?,
na: still tia licensed opsrators at Lyachburg that have not received farmal si te training on tha 54I incident and Rar.cho Seco Procedn ai C;1 Loges.
55IiO42 u=.s ~
' E &l b h,
~~.u
~
- 3[&~ ? ~~ ' f:_.}t}
'~:~
l.
D DNA h M.; Q ] j,
79071600<4(
-e.
2-
.s 4// 'li. h '.iit nceoticos noted below, Gogion i site irc:aectory,Jev ve e6 i; hat th: Sct:cns ta'<cn oy iM iicensea M S W' ' *d "
thei.. esponse to 1E3 79-05A, datsd T piil 16,1W9, havr bwn cocol r:ed:
a)
Trainina of li.:ensed operaters as ident!?ied in paragraph 3.above b'
ReMsion of procedures as identified in psragraph 1. abave.
u S.
klith th9 errPDhion of 09erator training as identified in paragraph
- 3. above, I feel that the licensee has fully responded to Itans 4.b. th u 4.d. and 6 thru 12 of IER 79-05 A and their stated actions are reasonable and correct.
h B. H. Faulker. berry, Chief Reactnr ProjectsSection II i ;.. ;j",