Confirms 790502 Telcon During Which Util Agreed to Establish Procedures & Instructions to Operators Re HPI Initiation.Agreement Conflicts W/Response to IE Bulletin 79-06A,Item 7c
ML19241B136
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/04/1979
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 7907110722
Download: ML19241B136 (1)


Text

T&

$O NC PO 80x 529100 Y FL g

,..,.a mm

=.

1 M

-a U S N R C P'e r,T' ' '

k.m 11 l"'.

s -c. gy;4 3

'a

-m recmca rc.un s uc c ccm aw 79 MM 25 AIO : 4 2 Mry 4, 1979 PRN-AD-79-50 File 920TP Mr. James P. O'Reilly, Director, Region II Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

Re: Turkey Point Units 3 & 4 Docket Nos. 50-250 and 50-251 I&E Bulletin 79-06A This letter confirms our telephone conversation on May 2,1979 during which I agreed that Turkey Point would establish procedures and instructions to the operators that in the event of HPI initiation with RCP's op erating at lea st two RCP's will remain operating as long as the pumps are providing forced flow.

to item 7C of I6F Bulletin This agreement is contrary to our response 79-06A.

However, we are continuing to work with our NSSS vendor to determine the proper disposition of this item.

Very truly yours,

. D. dc midt Vice President Power Resources GEL /cph r; -