Text
"f k
- /
%
UNITED STATES
4
f< , ,
,A
NUCLEAR REGULATORY COMMISSION
f
- 1
)
REGION I
- Tgg " f
638 PARK AVENUE
KING OF PRUSSI A. PENNSYLV ANI A 19406
g
' ' . . . . . "
M3
'M
Docket tios. 50-245
50-336
.'lortheast fluclear Energy Ccmpany
ATTri:
Mr. W. G. Counsil
Vice President - tiuclear Engineering
and Operation
P. O. Box 270
Hartford, Connecticut
06101
Gentlemen:
Subj ect:
Combined Inspection 50/245/79-07; 50-336/79-07
This refers to the inspection conducted by t'r. G. P. Yuhas of this
office on March 19-23, 1979 of activiti s authorized by tlRC License t!os.
DPR-21, DPR-65 and to the discussions of our findings held by fir. Yuhas
with Mr. J. F. Opeka and other members of your staff at the conclusion
of the inspection.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enc'iosed with this
letter. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, measurements made by the inspe: tor, and observations by the
inspector.
Our inspector also verified the steps you have taken to correct the
items of noncompliance brought to your attention in letters dated tiovember
3,1977, April 4,1978 and March 8,1979.
We have no further questions
regarding your action at this time.
Within the scope of this inspecticr., no items of noncompliance were
observed.
In accordance with Section 2.790 of the IIRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the t!RC's Public Document
Room.
If this report contains any information that you (or your contractor)
believe to be proprietary, it is necessary that you make a written
apolication within 20 days to this office to withhold such information
from public disclosure.
Any such application must be acccmanied by an
affidavit executed by the owner of the information, which
'fies the
Y
,
- %
J
G
g
/- J 'r
7907110,' g3
T
flortheast fluclear Energy Corpany
2
document or part sought to be withheld, and which contains a statement
of reasons which addresses with specificity the items which will be
considered by the Commission as listed in subparagraph (b)(4) of Section
2.790.
The information sought to be withheld shall be incorporated as
far as possible into a separate part of the affidavit.
If we do not
hear from you in this regard within the specified period, the report
will be placed in the Public Document Room.
tio reply to this letter is required; however, should you have any
questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
- /
,
-
George H. Smith, Chief
Fuel Facility and Materials Safety
Branch
Enclosure:
flotice of Inspection and Enforcenent Combined Inspection
- Report fiumbers 50-245/79-07; 50-336//9-07
cc w/ encl:
J. F. Opeka, Station Superintendent
D. G. Diedrick, flanager of Quality Assurance
J. R. Himmelwright, Licensing Safeguards Engineer
A. Z. Roisman,flatural Resources Defense Council (Without Report)
Qp
-