First Interim Deficiency Rept Re Lack of Design Considerations of Sum of Static,Thermal & SSE Deflections for Rigid & Variable Spring Pipe Supports.Potentially Deficient Piping Supports Reviewed
ML19241A771
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 06/21/1979
From:
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML19241A751 List:
References
NUDOCS 7907090369
Download: ML19241A771 (2)


Text

.

ENCLOSURE SEQUOYAH NUCLEAE v._ ANT LNITS 1 AND 2 PIPE SUPnCRT DE:.lGNERS D D.OT I'.

SUME CASES CColDEL dL SC OF DEFLECTIuS5

.,L..,0 I...d..,,. L, s..

n..J s n.:.t a n c.&u n..

.nn. riu. -..

c

.----e t

nc

.a ia..u r.

N C h '.-lP - 7 9-S - 7

_r_

iV L. r.

)s.JL\\e)

-,n t. X.e.sA A.

I.1 L rs.

A.n Descr:ption of Deficinncy The cesign of sc e rigid and some variable spring pire supports a:

Sequoyal Nuclear Plant did not consider tne sum of static, thernal, a.1; safe shutdown earthquake (SSE) deflections.

In most of these caseo, :ne designers sclected tne largest of the 'hree deflectient mentionec a::ve.

  • e; gners centributing to thi> de: :ciency are both at TVA and a: Ea3 :

Eno:ncera in Pittsourgh, PA (a div.sion of Dravo), wna performed sote ;;;e nan er aesign work cn contract from TVA.

3 sai.2caen deflection during an Sri not i;gured in;s t s. e ces.g

.m..

rt,vli ir. e::ner insufficient clearance available to prevent contact be:-cen the pipe and its support or the available deflection ci variarle spran suppor:s being insufficient :o prevent over-extension.

Once ecn-o tac *. Dc: ween pipe and support or over-extension of a spring pipe suppcr:

occura, a hign stress point results which could possibly lead to over-3;ressing of the piping and/or the affected support.

sert ei the pipes supported by celecteve supper:s are safetv-relatua.

~..

..s we;.clene. was cascovered by m.. A engineers investigcting anc::.or

,9-17/,ea.,ing wit.n covencn c: :ne stee.

.u us. ;v.))te) 1:ea (S _.un Cc.s c o n t a irm.u n t vessel (SCV) following a design basis acciden: inside cen-ta.naen anc resulting effects on piping wnich penetrates :ne S C'.

' 's A sa.11-era :nis deficiency to be recortable because of :ne poss;b. 2:

ic:

n ;;;n stress areas and possible subsequent failure due to overstress.n;

n saiet;.-rclated piping and supports during an SSL event.

L.e cause of this deficiency is the fal;ure of sote engineers at I'.' A anc at basie Engineers to follow a design criteria document which spec;;;es that deflec: ions due to thermal, dead weight, and S3E be succed in designing pipe supports.

Safet

rnlic.it ion s t...a oe:. c. e n ;. had remained uncorretteJ. an e di. evi n: Jur;.

,.e operat.va 1 nt have leu to overstres31a w; n subw que: : :a;.urs : r-.-.-

3 n

so: 4

~ tty-relattd piping anJ sup ort, ( e. >; er ane Au.u 11a r. r e e,.. a : <r As auch, the possible over s t ress Ani; wit h suomegaent tallure n sa: u.

-re.a:eu p;p a r.s arid suppor t s ::ght nave i= paired ne ab;1;;v of the p; ant t.

r<a.

a sJ1e andtdOwn Condition.

4

'$' Q C) 217 0t(:.Sd,9p@M%h p p aa o

@t %< pMsa gtg O S:a d

  • 'q~

7 0 07 0 9 0

.') e, s 3

n

/

/

8 Corrective Act:ons The ap p r c >. ama t e ly 330] potent;all-ce: 2c;en:,; rang suppor:

ha.e retr 3

rev;t-ed and checked to verify correctne w a: tne Jesign.

As a r t :.

af

.u s e-beta 1:entified as requiring ma;.;;a-

..13 design revtes, hangers.
  • on, e2ther

~.a hari.are or in sett'ng :ne spring on variable sprir.g-: pe suppor: 2.

Pipe supports at other TVA nuclear plants are presen:1j bein; investi;;sted to ensare tha: this deficiency does not exist at those planta.

1eans laken To Prevent Recurrence Ta la resenti. Investiga:Ing :.. teans tha: s;11 be taken to pre.tr:

<mm=eme,: :nis y,

cet1:1 enc

he,e me_,m,e s..... ;

ce.a1.e;.,,

blUsequer: repor on this defiClenC)

A

<.m a %

m

, ?b..f g# N' ND h(giO*n'[ vy

- ah

~

' V,S$

g.3 gt#g% A g %w@

309 218

.